{"id":16991,"date":"2020-10-08T14:55:42","date_gmt":"2020-10-08T11:55:42","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16991"},"modified":"2024-06-25T11:36:05","modified_gmt":"2024-06-25T08:36:05","slug":"september-2020-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16991&lang=en","title":{"rendered":"September 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>NOMARCHIA Station<\/strong><strong>:<\/strong> The works for the installation of a steel emergency escape hatch have been completed, while in progress are works for the installation of HVAC equipment.<\/li>\n<li><strong>KALAMARIA<\/strong> <strong>Station<\/strong><strong>: <\/strong>In progress are works for the construction of network-related infrastructure and works for the implementation of traffic regulations -phase H. In progress are works for the installation of balustrades in technical rooms.<\/li>\n<li><strong>ARETSOU Station:<\/strong> Earthing and lighting network cabling works are in progress.<\/li>\n<li><strong>PONTOU Shaft: <\/strong>In progress are works for the construction of industrial flooring and street-level reinstatement works.<\/li>\n<li><strong>NEA<\/strong> <strong>KRINI<\/strong> <strong>Station<\/strong><strong>:<\/strong> In progress are works for the construction of water supply and fire fighting pits and sound proofing works.<\/li>\n<li><strong>MIKRA<\/strong> <strong>Station<\/strong><strong>: <\/strong>In progress are works for the installation of balustrades and handrails.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong> The works for the assembly of tracks and welding works on Track 2 from KALAMARIA Station up to K.P. 2+800 and from NOMARCHIA Crossover up to KALAMARIA Station have been completed. Moreover, concreting works on tracks 1 &amp; 2 from K.P. 2+800 up to the 2<sup>nd<\/sup> Crossover (except for MIKRA Station) and from the 2<sup>nd<\/sup> Crossover up to the Forestation have been completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; NOMARCHIA Station: The works for the installation of a steel emergency escape hatch have been completed, while in progress are works for the installation of HVAC equipment. KALAMARIA Station: In progress are works for the construction of network-related infrastructure and works for the implementation of traffic regulations -phase H. In progress are works for the installation of balustrades in technical rooms. ARETSOU Station: Earthing and lighting network cabling works are in progress. PONTOU Shaft: In progress are works for the construction of industrial flooring and street-level reinstatement works. NEA KRINI Station: In progress are works for the construction of water supply and fire fighting pits and sound proofing works. MIKRA Station: In progress are works for the installation of balustrades and handrails. TRACKWORK: The works for the assembly of tracks and welding works on Track 2 from KALAMARIA Station up to K.P. 2+800 and from NOMARCHIA Crossover up to KALAMARIA Station have been completed. Moreover, concreting works on tracks 1 &amp; 2 from K.P. 2+800 up to the 2nd Crossover (except for MIKRA Station) and from the 2nd Crossover up to the Forestation have been completed.<\/p>\n","protected":false},"author":4,"featured_media":16956,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-16991","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20.jpg",2248,1500,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20.jpg",2248,1500,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20.jpg",2248,1500,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-2048x1367.jpg",2048,1367,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-1140x761.jpg",1140,761,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/10\/KALAMARIA_09_20-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; NOMARCHIA Station: The works for the installation of a steel emergency escape hatch have been completed, while in progress are works for the installation of HVAC equipment. KALAMARIA Station: In progress are works for the construction of network-related infrastructure and works for the implementation of traffic regulations -phase H. In progress are works for&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16991"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16991\/revisions"}],"predecessor-version":[{"id":19907,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16991\/revisions\/19907"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16956"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}