{"id":16845,"date":"2020-09-15T10:56:30","date_gmt":"2020-09-15T07:56:30","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16845"},"modified":"2024-06-25T11:37:50","modified_gmt":"2024-06-25T08:37:50","slug":"july-2020-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16845&lang=en","title":{"rendered":"July 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong>Kritis Shaft<\/strong><strong>: <\/strong>Preparatory works for street-level reinstatement are in progress.<\/p>\n<p><strong>NOMARCHIA Station<\/strong><strong>:<\/strong> In progress are works for the installation of windows in rooms 2.2 &amp; 2.3, as well as earthing works and works for the installation of air duct networks for HVAC system.<\/p>\n<p><strong>KALAMARIA<\/strong> <strong>Station<\/strong><strong>: <\/strong>In progress are works for the installation of windows in rooms 2.2 &amp; 2.3, as well as earthing works and cabling works for the lighting network.<\/p>\n<p><strong>PONTOU Shaft: <\/strong>In progress are works for the construction of industrial floors, as well as reinstatement works at street level.<\/p>\n<p><strong>NEA<\/strong> <strong>KRINI<\/strong> <strong>Station<\/strong><strong>:<\/strong> In progress are escalators\u2019 testing and setting works.<\/p>\n<p><strong>MIKRA<\/strong> <strong>Station<\/strong><strong>: <\/strong>Preliminary works for street-level reinstatement at the 2<sup>nd<\/sup> Crossover are in progress.<\/p>\n<p><strong>Trackwork:<\/strong> In progress are sleepers distribution related works on track 2 and rail assembly and welding related works on track 1 from KALAMARIA Station up to KP 2+800. Moreover, in progress are sleepers distribution related works on tracks 1 and 2, rail assembly and welding related works on track 1 from NOMARCHIA Crossover up to KALAMARIA Station, as well as concreting works on tracks 1 &amp; 2 from KP 2+800 up to the 2<sup>nd<\/sup> Crossover.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Kritis Shaft: Preparatory works for street-level reinstatement are in progress. NOMARCHIA Station: In progress are works for the installation of windows in rooms 2.2 &amp; 2.3, as well as earthing works and works for the installation of air duct networks for HVAC system. KALAMARIA Station: In progress are works for the installation of windows in rooms 2.2 &amp; 2.3, as well as earthing works and cabling works for the lighting network. PONTOU Shaft: In progress are works for the construction of industrial floors, as well as reinstatement works at street level. NEA KRINI Station: In progress are escalators\u2019 testing and setting works. MIKRA Station: Preliminary works for street-level reinstatement at the 2nd Crossover are in progress. Trackwork: In progress are sleepers distribution related works on track 2 and rail assembly and welding related works on track 1 from KALAMARIA Station up to KP 2+800. Moreover, in progress are sleepers distribution related works on tracks 1 and 2, rail assembly and welding related works on track 1 from NOMARCHIA Crossover up to KALAMARIA Station, as well as concreting works on tracks 1 &amp; 2 from KP 2+800 up to the 2nd Crossover.<\/p>\n","protected":false},"author":4,"featured_media":16814,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-16845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20.jpg",2248,1500,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20.jpg",2248,1500,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20.jpg",2248,1500,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-2048x1367.jpg",2048,1367,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-1140x761.jpg",1140,761,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KALAMARIA_07_20-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; Kritis Shaft: Preparatory works for street-level reinstatement are in progress. NOMARCHIA Station: In progress are works for the installation of windows in rooms 2.2 &amp; 2.3, as well as earthing works and works for the installation of air duct networks for HVAC system. KALAMARIA Station: In progress are works for the installation of windows&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16845"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16845\/revisions"}],"predecessor-version":[{"id":19912,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16845\/revisions\/19912"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16814"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}