{"id":16385,"date":"2020-05-15T12:50:24","date_gmt":"2020-05-15T09:50:24","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16385"},"modified":"2024-06-25T11:42:46","modified_gmt":"2024-06-25T08:42:46","slug":"april-2020-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16385&lang=en","title":{"rendered":"April 2020"},"content":{"rendered":"<p><strong>Kritis Shaft<\/strong><strong>: <\/strong>The preliminary works for the construction of masonry walls are in progress.<\/p>\n<p><strong>NOMARCHIA Station<\/strong><strong> (<\/strong><strong>station<\/strong><strong> &amp; <\/strong><strong>crossover<\/strong><strong>):<\/strong> The preliminary works for the reinstatement of the surrounding area and the works for the installation of a fire detection network are in progress.<\/p>\n<p><strong>KALAMARIA<\/strong> <strong>Station<\/strong><strong>: <\/strong>The works for the installation of outdoor metal sheds, the installation of platform granites and the works for the installation of a water supply network, a tunnel ventilation network (fire-rated air ducts) and earthing are in progress.<\/p>\n<p><strong>Pontou Shaft:<\/strong> Waterproofing works are in progress.<\/p>\n<p><strong>NEA<\/strong> <strong>KRINI<\/strong> <strong>Station<\/strong><strong>:<\/strong> Infrastructure works for irrigation and lighting networks in the surrounding area are in progress.<\/p>\n<p><strong>MIKRA<\/strong> <strong>Station<\/strong><strong> (<\/strong><strong>station<\/strong> <strong>and<\/strong> <strong>crossovers<\/strong><strong>): <\/strong>At the 1<sup>st<\/sup> crossover, surface reinstatement preliminary works are in progress.<\/p>\n<p><strong>\u03a4\u0392\u039c Tunnels:<\/strong> Trackwork construction works in a section of the project tunnels are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kritis Shaft: The preliminary works for the construction of masonry walls are in progress. NOMARCHIA Station (station &amp; crossover): The preliminary works for the reinstatement of the surrounding area and the works for the installation of a fire detection network are in progress. KALAMARIA Station: The works for the installation of outdoor metal sheds, the installation of platform granites and the works for the installation of a water supply network, a tunnel ventilation network (fire-rated air ducts) and earthing are in progress. Pontou Shaft: Waterproofing works are in progress. NEA KRINI Station: Infrastructure works for irrigation and lighting networks in the surrounding area are in progress. MIKRA Station (station and crossovers): At the 1st crossover, surface reinstatement preliminary works are in progress. \u03a4\u0392\u039c Tunnels: Trackwork construction works in a section of the project tunnels are in progress.<\/p>\n","protected":false},"author":4,"featured_media":16156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-16385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20.jpg",720,540,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/05\/KALAMARIA_04_20-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"Kritis Shaft: The preliminary works for the construction of masonry walls are in progress. NOMARCHIA Station (station &amp; crossover): The preliminary works for the reinstatement of the surrounding area and the works for the installation of a fire detection network are in progress. KALAMARIA Station: The works for the installation of outdoor metal sheds, the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16385"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16385\/revisions"}],"predecessor-version":[{"id":29015,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16385\/revisions\/29015"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16156"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}