{"id":16359,"date":"2020-06-11T09:24:25","date_gmt":"2020-06-11T06:24:25","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16359"},"modified":"2024-06-25T13:45:44","modified_gmt":"2024-06-25T10:45:44","slug":"may-2020","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16359&lang=en","title":{"rendered":"MAY 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><u>AGHIA VARVARA STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Wall and columns cladding (metal, glass etc.)<\/li>\n<li>Reinstatement works at street level (passageways, marbles)<\/li>\n<li>Other reinstatement works at street level<\/li>\n<li>Installation of metal false ceilings<\/li>\n<li>Architectural finishes (installation of balustrades and handrails)<\/li>\n<li>Installation of lifts at street level.<\/li>\n<\/ul>\n<p><strong><u>MEGALOU ALEXANDROU SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Planting (street level).<\/li>\n<\/ul>\n<p><strong><u>TAXIARCHON SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Painting works<\/li>\n<li>Configuration at street level.<\/li>\n<\/ul>\n<p><strong><u>KORYDALLOS STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Wall and Columns cladding<\/li>\n<li>Installation of false ceilings<\/li>\n<li>Installation of balustrades<\/li>\n<li>Installation of irrigation system at street level<\/li>\n<li>Installation of signage<\/li>\n<li>Installation of stainless steel structures<\/li>\n<li>Repair of painted surfaces and worn granites<\/li>\n<li>Installation of Station entrances\u2019 sheds<\/li>\n<li>Configuration at street level (Eleftherias Square).<\/li>\n<\/ul>\n<p><strong><u>NIKEA STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Wall cladding with metal panels<\/li>\n<li>Cladding and handrails for escalators<\/li>\n<li>False ceilings<\/li>\n<li>Glass barriers in public areas<\/li>\n<li>Replacement of floor paving slabs at street level.<\/li>\n<\/ul>\n<p><strong><u>NATM TUNNEL FOR STATION VENTILATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Construction of the final lining<\/li>\n<li>Painting works (still pending are painting works at the connection with TBM tunnel)<\/li>\n<li>Construction of industrial floor.<\/li>\n<\/ul>\n<p><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>STATION\u2019s C\/C <\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Waterproofing of perimeter paramet walls<\/li>\n<li>Permanent lining of the foundation (level -4)<\/li>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of the ticketing area slab (level -2)<\/li>\n<li>Permanent lining of staircace S4<\/li>\n<li>Permanent lining of E\/M slab (level -1)<\/li>\n<li>Permanent lining of perimeter walls and columns.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Permanent lining of the roof slab and staircase S3.<\/li>\n<\/ul>\n<p><strong><u>MAIN TUNNEL OF THE STATION<\/u><\/strong><strong><u> (<\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong><strong><u>)<\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Permanent lining of the station\u2019s main tunnel<\/li>\n<li>Permanent lining of the deepening area<\/li>\n<li>Permanent lining of the northern and southern headwall<\/li>\n<li>Construction of parapet walls and platform slabs<\/li>\n<li>Secondary grouting of the vault of the main station tunnel.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Filling of platform ducts with non-reinforced concrete.<\/li>\n<\/ul>\n<p><strong><u>PIRAEUS STATION\u00a0 <\/u><\/strong><\/p>\n<p><strong><u>STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Installation and prestressing of struts for temporary retaining up to level 5 and of 14 out of 17 struts at level 6.<\/li>\n<li>Installation of waterproofing underneath the foundation at bays 1, 2, 3, 4 (still pending is the pumping station)<\/li>\n<li>Concreting of the foundation slab at sections 1, 4.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of the foundation slab\u2019s reinforcement and concreting at sections 5N and 5B and in the pumping station area. Completion of concreting of the foundation slab of the main station.<\/li>\n<li>Excavation in the area of the station\u2019s pumping station. Completion of the excavation of the main station.<\/li>\n<li>Concreting of parapet walls underneath the platforms and of the non reinforced concrete filling at bays 2, 3, 5N and 35B.<\/li>\n<li>Installation and pre-loading of 10 struts of the temporary retaining at level 6.<\/li>\n<li>Installation of waterproofing underneath the foundation in the area of the pumping station. Completion of the waterproofing of the main station\u2019s foundation.<\/li>\n<li>Removal of the 5<sup>th<\/sup> and 6<sup>th<\/sup> rows of struts in progress.<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Door installation at the E\/M floor.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Conservation of the Project\u2019s archaeological finds<\/li>\n<li>Brick structures at the ticketing and platform levels<\/li>\n<li>Preliminary works for roof painting at platform level<\/li>\n<li>Cleaning works.<\/li>\n<\/ul>\n<p><strong><u>UNDERGROUND PART OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, parapet walls and platform slab.<\/li>\n<\/ul>\n<p><strong><u>STAIRCASE GALLERIES <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining and works related to secondary concreting.<\/li>\n<\/ul>\n<p><strong><u>KORAI SQUARE ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, secondary concrete and waterproofing.<\/li>\n<\/ul>\n<p><strong><u>BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level)<\/li>\n<li>Secondary concrete at the staircases.<\/li>\n<\/ul>\n<p><strong>The following works are put on hold: <\/strong><\/p>\n<ul>\n<li>Secondary concrete at the access gallery.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; AGHIA VARVARA STATION The following works are in progress: Wall and columns cladding (metal, glass etc.) Reinstatement works at street level (passageways, marbles) Other reinstatement works at street level Installation of metal false ceilings Architectural finishes (installation of balustrades and handrails) Installation of lifts at street level. MEGALOU ALEXANDROU SHAFT The following works are still pending: Planting (street level). TAXIARCHON SHAFT The following works are in progress: Painting works Configuration at street level. KORYDALLOS STATION The following works are in progress: Wall and Columns cladding Installation of false ceilings Installation of balustrades Installation of irrigation system at street level Installation of signage Installation of stainless steel structures Repair of painted surfaces and worn granites Installation of Station entrances\u2019 sheds Configuration at street level (Eleftherias Square). NIKEA STATION MAIN STATION The following works are in progress: Wall cladding with metal panels Cladding and handrails for escalators False ceilings Glass barriers in public areas Replacement of floor paving slabs at street level. NATM TUNNEL FOR STATION VENTILATION The following works have been completed: Construction of the final lining Painting works (still pending are painting works at the connection with TBM tunnel) Construction of industrial floor. MANIATIKA STATION STATION\u2019s C\/C The following works have been completed: Waterproofing of perimeter paramet walls Permanent lining of the foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of the ticketing area slab (level -2) Permanent lining of staircace S4 Permanent lining of E\/M slab (level -1) Permanent lining of perimeter walls and columns. The following works are in progress: Permanent lining of the roof slab and staircase S3. MAIN TUNNEL OF THE STATION (\u039d\u0391\u03a4\u039c) The following works have been completed: Permanent lining of the station\u2019s main tunnel Permanent lining of the deepening area Permanent lining of the northern and southern headwall Construction of parapet walls and platform slabs Secondary grouting of the vault of the main station tunnel. The following works are in progress: Filling of platform ducts with non-reinforced concrete. PIRAEUS STATION\u00a0 STATION The following works have been completed: Installation and prestressing of struts for temporary retaining up to level 5 and of 14 out of 17 struts at level 6. Installation of waterproofing underneath the foundation at bays 1, 2, 3, 4 (still pending is the pumping station) Concreting of the foundation slab at sections 1, 4. The following works are in progress: Installation of the foundation slab\u2019s reinforcement and concreting at sections 5N and 5B and in the pumping station area. Completion of concreting of the foundation slab of the main station. Excavation in the area of the station\u2019s pumping station. Completion of the excavation of the main station. Concreting of parapet walls underneath the platforms and of the non reinforced concrete filling at bays 2, 3, 5N and 35B. Installation and pre-loading of 10 struts of the temporary retaining at level 6. Installation of waterproofing underneath the foundation in the area of the pumping station. Completion of the waterproofing of the main station\u2019s foundation. Removal of the 5th and 6th rows of struts in progress. DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works are still pending: Door installation at the E\/M floor. The following works are in progress: Conservation of the Project\u2019s archaeological finds Brick structures at the ticketing and platform levels Preliminary works for roof painting at platform level Cleaning works. UNDERGROUND PART OF THE STATION The following works have been completed: Concreting of the permanent lining, parapet walls and platform slab. STAIRCASE GALLERIES The following works have been completed: Concreting of the permanent lining and works related to secondary concreting. KORAI SQUARE ENTRANCE AND ACCESS GALLERY The following works have been completed: Concreting of the permanent lining, secondary concrete and waterproofing. BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY \u00a0The following works have been completed: Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level) Secondary concrete at the staircases. The following works are put on hold: Secondary concrete at the access gallery. \u00a0<\/p>\n","protected":false},"author":12,"featured_media":16344,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-16359","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1.jpg",2560,1440,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1.jpg",2560,1440,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1.jpg",2560,1440,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-300x169.jpg",300,169,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-1024x576.jpg",960,540,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-1536x864.jpg",1536,864,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-2048x1152.jpg",2048,1152,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-1140x641.jpg",1140,641,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/06\/IMG_8728-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"&nbsp; AGHIA VARVARA STATION The following works are in progress: Wall and columns cladding (metal, glass etc.) Reinstatement works at street level (passageways, marbles) Other reinstatement works at street level Installation of metal false ceilings Architectural finishes (installation of balustrades and handrails) Installation of lifts at street level. MEGALOU ALEXANDROU SHAFT The following works are&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16359","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16359"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16359\/revisions"}],"predecessor-version":[{"id":19918,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16359\/revisions\/19918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16344"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}