{"id":16059,"date":"2020-01-20T13:18:00","date_gmt":"2020-01-20T11:18:00","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16059"},"modified":"2024-06-25T11:48:42","modified_gmt":"2024-06-25T08:48:42","slug":"december-2019-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16059&lang=en","title":{"rendered":"December 2019"},"content":{"rendered":"<p><strong>NEW<\/strong> <strong>RAILWAY<\/strong> <strong>STATION<\/strong><strong>: <\/strong>Works for the reinstatement of the indoor lift and works for the preparation of the tunnel filling concrete are in progress.<\/p>\n<p><strong>DIMOKRATIAS Station <\/strong><strong>(<\/strong><strong>Station <\/strong><strong>&amp; <\/strong><strong>Crossover<\/strong><strong>):<\/strong> In the framework of the 30<sup>th<\/sup> Traffic Reinstatement Plan, works for the construction of the central island at Monastiriou Street have been completed.<\/p>\n<p><strong>VENIZELOU<\/strong> <strong>Station<\/strong><strong>: <\/strong>Works for the construction of the station roof slab at the south section have been completed.<\/p>\n<p><strong>AGHIA<\/strong> <strong>SOFIA<\/strong> <strong>Station<\/strong><strong>: <\/strong>Platform construction works have been completed. The construction of a ventilation shaft\/emergency exit and the construction of a north and south access are in progress.<\/p>\n<p><strong>ANALIPSI Station<\/strong> <strong>(<\/strong><strong>Station <\/strong><strong>&amp; <\/strong><strong>Crossover<\/strong><strong>):<\/strong> Works for the construction of the tunnel track bed are in progress.<\/p>\n<p><strong>DEPOT<\/strong><strong>: <\/strong><\/p>\n<p><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399<\/strong><strong>: <\/strong>The installation of balustrades is in progress.<\/p>\n<p><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399\u0399<\/strong><strong>: <\/strong>The works for the construction of the outdoor false ceiling are in progress.<\/p>\n<p><strong>\u03a4\u0392\u039c<\/strong> <strong>Tunnels<\/strong><strong>:<\/strong> Trackwork construction works at a section of the project tunnels are in progress.<\/p>\n<p>E\/M works at DIMOKRATIAS, SINTRIVANI\/EXPO, PANEPISTIMIO, EFKLIDIS, 25 MARTIOU (Station and Crossover) and NEA ELVETIA Stations are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW RAILWAY STATION: Works for the reinstatement of the indoor lift and works for the preparation of the tunnel filling concrete are in progress. DIMOKRATIAS Station (Station &amp; Crossover): In the framework of the 30th Traffic Reinstatement Plan, works for the construction of the central island at Monastiriou Street have been completed. VENIZELOU Station: Works for the construction of the station roof slab at the south section have been completed. AGHIA SOFIA Station: Platform construction works have been completed. The construction of a ventilation shaft\/emergency exit and the construction of a north and south access are in progress. ANALIPSI Station (Station &amp; Crossover): Works for the construction of the tunnel track bed are in progress. DEPOT: Building Complex \u0399: The installation of balustrades is in progress. Building Complex \u0399\u0399: The works for the construction of the outdoor false ceiling are in progress. \u03a4\u0392\u039c Tunnels: Trackwork construction works at a section of the project tunnels are in progress. E\/M works at DIMOKRATIAS, SINTRIVANI\/EXPO, PANEPISTIMIO, EFKLIDIS, 25 MARTIOU (Station and Crossover) and NEA ELVETIA Stations are in progress.<\/p>\n","protected":false},"author":4,"featured_media":16014,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-16059","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19.jpg",1600,1198,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19.jpg",1600,1198,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19.jpg",1600,1198,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-1024x767.jpg",960,719,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-1536x1150.jpg",1536,1150,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19.jpg",1600,1198,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-1140x854.jpg",1140,854,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/BASIKO_ERGO_12_19-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"NEW RAILWAY STATION: Works for the reinstatement of the indoor lift and works for the preparation of the tunnel filling concrete are in progress. DIMOKRATIAS Station (Station &amp; Crossover): In the framework of the 30th Traffic Reinstatement Plan, works for the construction of the central island at Monastiriou Street have been completed. VENIZELOU Station: Works&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16059"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16059\/revisions"}],"predecessor-version":[{"id":19931,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16059\/revisions\/19931"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16014"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}