{"id":16009,"date":"2020-02-11T13:22:40","date_gmt":"2020-02-11T11:22:40","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=16009"},"modified":"2024-06-25T13:48:50","modified_gmt":"2024-06-25T10:48:50","slug":"january-2020","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=16009&lang=en","title":{"rendered":"JANUARY 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><u>AGHIA VARVARA STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of lifts in the station<\/li>\n<li>Wall and columns cladding (metal, glass etc.)<\/li>\n<li>Installation of handrails<\/li>\n<li>Other architectural finishes<\/li>\n<li>Installation of station and other signs<\/li>\n<li>Installation of a fountain<\/li>\n<li>Planting and irrigation system<\/li>\n<li>Installation of false ceilings at the ticketing level.<\/li>\n<\/ul>\n<p><strong><u>MEGALOU ALEXANDROU SHAFT<\/u><\/strong><\/p>\n<p><strong>Works have been completed. <\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Planting (street level)<\/li>\n<\/ul>\n<p><strong><u>TAXIARCHON SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Painting works<\/li>\n<li>Installation of metal structures<\/li>\n<li>Configuration at street level<\/li>\n<\/ul>\n<p><strong><u>KORYDALLOS STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Wall and Columns cladding<\/li>\n<li>Installation of false ceilings<\/li>\n<li>Installation of lift at street level<\/li>\n<li>Installation of handrails<\/li>\n<li>Installation of balustrades<\/li>\n<li>Installation of Station entrances\u2019 sheds<\/li>\n<li>Installation of lift at street level<\/li>\n<li>Configuration at street level (Eleftherias Square)<\/li>\n<\/ul>\n<p><strong><u>NIKEA STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Final reinstatement of the surrounding area<\/li>\n<li>Painting of parapet walls at terminating points, at street level (level 0)<\/li>\n<li>False ceilings<\/li>\n<li>Cladding of vertical elements using metal panels<\/li>\n<\/ul>\n<p><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>OPEN CUT OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Permanent lining of foundation (level -4)<\/li>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of ticketing level slab (level -2)<\/li>\n<li>Permanent lining of staircase S4<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Waterproofing of perimeter walls<\/li>\n<li>Permanent lining of perimeter walls, columns and intermediate slabs.<\/li>\n<\/ul>\n<p><strong><u>PIRAEUS STATION\u00a0 <\/u><\/strong><\/p>\n<p><strong><u>STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Installation and prestressing of struts for temporary retaining at all levels.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of reinforcement and concreting at roof bay #4.<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Door installation at the E\/M floor<\/li>\n<li>Waterproofing at street level<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Filing concrete underneath the platforms<\/li>\n<li>Industrial floor paving at E\/M floor<\/li>\n<li>Masonry walls at ticketing level<\/li>\n<\/ul>\n<p><strong><u>UNDERGROUND PART OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, parapet walls and platform slab.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; AGHIA VARVARA STATION The following works are in progress: Installation of lifts in the station Wall and columns cladding (metal, glass etc.) Installation of handrails Other architectural finishes Installation of station and other signs Installation of a fountain Planting and irrigation system Installation of false ceilings at the ticketing level. MEGALOU ALEXANDROU SHAFT Works have been completed. \u00a0The following works are still pending: Planting (street level) TAXIARCHON SHAFT The following works are in progress: Painting works Installation of metal structures Configuration at street level KORYDALLOS STATION The following works are in progress: Wall and Columns cladding Installation of false ceilings Installation of lift at street level Installation of handrails Installation of balustrades Installation of Station entrances\u2019 sheds Installation of lift at street level Configuration at street level (Eleftherias Square) NIKEA STATION MAIN STATION The following works are in progress: Final reinstatement of the surrounding area Painting of parapet walls at terminating points, at street level (level 0) False ceilings Cladding of vertical elements using metal panels MANIATIKA STATION OPEN CUT OF THE STATION The following works have been completed: Permanent lining of foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of ticketing level slab (level -2) Permanent lining of staircase S4 \u00a0The following works are in progress: Waterproofing of perimeter walls Permanent lining of perimeter walls, columns and intermediate slabs. PIRAEUS STATION\u00a0 STATION The following works have been completed: Installation and prestressing of struts for temporary retaining at all levels. The following works are in progress: Installation of reinforcement and concreting at roof bay #4. DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works are still pending: Door installation at the E\/M floor Waterproofing at street level The following works are in progress: Filing concrete underneath the platforms Industrial floor paving at E\/M floor Masonry walls at ticketing level UNDERGROUND PART OF THE STATION The following works have been completed: Concreting of the permanent lining, parapet walls and platform slab. \u00a0<\/p>\n","protected":false},"author":12,"featured_media":16006,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-16009","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1.jpg",2560,1708,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1.jpg",2560,1708,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1.jpg",2560,1708,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-2048x1366.jpg",2048,1366,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-1140x761.jpg",1140,761,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/02\/IMG_4660-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"&nbsp; AGHIA VARVARA STATION The following works are in progress: Installation of lifts in the station Wall and columns cladding (metal, glass etc.) Installation of handrails Other architectural finishes Installation of station and other signs Installation of a fountain Planting and irrigation system Installation of false ceilings at the ticketing level. MEGALOU ALEXANDROU SHAFT Works&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16009"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16009\/revisions"}],"predecessor-version":[{"id":19925,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/16009\/revisions\/19925"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16006"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}