{"id":15946,"date":"2020-01-15T14:04:57","date_gmt":"2020-01-15T12:04:57","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=15946"},"modified":"2024-06-25T13:50:53","modified_gmt":"2024-06-25T10:50:53","slug":"december-2019","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=15946&lang=en","title":{"rendered":"DECEMBER 2019"},"content":{"rendered":"<p><strong><u>DOUBLE TRACK NATM START TUNNEL <\/u><\/strong><\/p>\n<p><strong>Works have been completed. <\/strong><\/p>\n<p><strong><u>KOMNINOU SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch<\/li>\n<li>Street level reinstatement<\/li>\n<\/ul>\n<p><strong><u>AGHIA VARVARA STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of lifts in the station<\/li>\n<li>Wall and columns cladding (metal, glass etc.)<\/li>\n<li>Installation of handrails<\/li>\n<li>Other architectural finishes<\/li>\n<li>Installation of station and other signs<\/li>\n<li>Installation of a fountain<\/li>\n<li>Planting and irrigation system<\/li>\n<li>Installation of false ceilings at the ticketing level.<\/li>\n<\/ul>\n<p><strong><u>MEGALOU ALEXANDROU SHAFT<\/u><\/strong><\/p>\n<p><strong>Works have been completed. <\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Planting (street level)<\/li>\n<\/ul>\n<p><strong><u>TAXIARCHON SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Painting works<\/li>\n<li>Filling works and industrial floors<\/li>\n<li>Installation of doors<\/li>\n<li>Installation of ceramic tiles<\/li>\n<li>Installation of metal structures<\/li>\n<\/ul>\n<p><strong><u>KORYDALLOS STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of doors<\/li>\n<li>Installation of granites or marbles<\/li>\n<li>Wall and Columns cladding<\/li>\n<li>Installation of false ceilings<\/li>\n<li>Installation of lift at street level<\/li>\n<li>Installation of handrails<\/li>\n<li>Installation of balustrades<\/li>\n<\/ul>\n<p><strong><u>PISSIDIAS SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Handrails \u2013 balustrades at the emergency staircase<\/li>\n<li>Final reinstatement at street level (removal &#8211; dismantling).<\/li>\n<\/ul>\n<p><strong><u>NIKEA STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Roof cladding using horizontal false ceiling panels at several levels of the Station<\/li>\n<li>Wall cladding using metal panels at level -3 of the platforms<\/li>\n<li>Final reinstatement of the surrounding area at street level (slab paving \u2013 minor structures\u2019 concrete)<\/li>\n<li>Installation of metal shed at the central entrance of the Station<\/li>\n<li>Installation of metal structure to support the glass panels of the PSN lifts<\/li>\n<li>Preliminary works for the installation of fire rated glass panels at the public staircases, at level -3 of the platforms<\/li>\n<li>Preliminary works for the installation of aluminum glass panels in public areas, at level -1 of the E\/M floor.<\/li>\n<\/ul>\n<p><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>OPEN CUT OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Permanent lining of foundation (level -4)<\/li>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of staircase S4<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Door installation at the E\/M floor<\/li>\n<li>Waterproofing at street level<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Concreting of the east shaft termination<\/li>\n<li>Filing concrete underneath the platforms.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>DOUBLE TRACK NATM START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch Street level reinstatement AGHIA VARVARA STATION The following works are in progress: Installation of lifts in the station Wall and columns cladding (metal, glass etc.) Installation of handrails Other architectural finishes Installation of station and other signs Installation of a fountain Planting and irrigation system Installation of false ceilings at the ticketing level. MEGALOU ALEXANDROU SHAFT Works have been completed. The following works are still pending: Planting (street level) TAXIARCHON SHAFT The following works are in progress: Painting works Filling works and industrial floors Installation of doors Installation of ceramic tiles Installation of metal structures KORYDALLOS STATION The following works are in progress: Installation of doors Installation of granites or marbles Wall and Columns cladding Installation of false ceilings Installation of lift at street level Installation of handrails Installation of balustrades PISSIDIAS SHAFT The following works are in progress: Handrails \u2013 balustrades at the emergency staircase Final reinstatement at street level (removal &#8211; dismantling). NIKEA STATION MAIN STATION The following works are in progress: Roof cladding using horizontal false ceiling panels at several levels of the Station Wall cladding using metal panels at level -3 of the platforms Final reinstatement of the surrounding area at street level (slab paving \u2013 minor structures\u2019 concrete) Installation of metal shed at the central entrance of the Station Installation of metal structure to support the glass panels of the PSN lifts Preliminary works for the installation of fire rated glass panels at the public staircases, at level -3 of the platforms Preliminary works for the installation of aluminum glass panels in public areas, at level -1 of the E\/M floor. MANIATIKA STATION OPEN CUT OF THE STATION The following works have been completed: Permanent lining of foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of staircase S4 DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works are still pending: Door installation at the E\/M floor Waterproofing at street level The following works are in progress: Concreting of the east shaft termination Filing concrete underneath the platforms.<\/p>\n","protected":false},"author":12,"featured_media":15941,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-15946","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1.jpg",2560,1707,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1.jpg",2560,1707,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1.jpg",2560,1707,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-2048x1366.jpg",2048,1366,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-1140x760.jpg",1140,760,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/IMG_3905-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"DOUBLE TRACK NATM START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch Street level reinstatement AGHIA VARVARA STATION The following works are in progress: Installation of lifts in the station Wall and columns cladding (metal,&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15946"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15946\/revisions"}],"predecessor-version":[{"id":31045,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15946\/revisions\/31045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15941"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15946"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15946"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}