{"id":15931,"date":"2019-12-19T15:29:44","date_gmt":"2019-12-19T13:29:44","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=15931"},"modified":"2024-06-25T11:59:21","modified_gmt":"2024-06-25T08:59:21","slug":"november-2019-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=15931&lang=en","title":{"rendered":"November 2019"},"content":{"rendered":"<p><strong>NOMARCHIA Station:<\/strong> The works for the reinstatement of PUO networks and the configuration of the surrounding area are in progress.<\/p>\n<p><strong>KALAMARIA Station:<\/strong> The following works are in progress: painting works at track level, backfilling of the surrounding area and reinstatement of PUO networks.<\/p>\n<p><strong>ARETSOU Station:<\/strong> The works for the construction of metal elements in the surrounding area are in progress.<\/p>\n<p><strong>Pontou shaft:<\/strong> The construction of the permanent lining is in progress.<\/p>\n<p><strong>NEA KRINI Station:<\/strong> Surface reinstatement works are in progress.<\/p>\n<p><strong>MIKRA Station (Station &amp; Crossovers):<\/strong> Surface backfilling works at the 1<sup>st<\/sup> Crossover are in progress.<\/p>\n<p>The works for the installation of E\/M systems at the following stations: NOMARCHIA, KALAMARIA, N. KRINI Station and MIKRA, as well as at the 1<sup>st<\/sup> and 2<sup>nd<\/sup> Crossovers are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station: The works for the reinstatement of PUO networks and the configuration of the surrounding area are in progress. KALAMARIA Station: The following works are in progress: painting works at track level, backfilling of the surrounding area and reinstatement of PUO networks. ARETSOU Station: The works for the construction of metal elements in the surrounding area are in progress. Pontou shaft: The construction of the permanent lining is in progress. NEA KRINI Station: Surface reinstatement works are in progress. MIKRA Station (Station &amp; Crossovers): Surface backfilling works at the 1st Crossover are in progress. The works for the installation of E\/M systems at the following stations: NOMARCHIA, KALAMARIA, N. KRINI Station and MIKRA, as well as at the 1st and 2nd Crossovers are in progress.<\/p>\n","protected":false},"author":4,"featured_media":15929,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-15931","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-720x540.jpg",720,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19.jpg",720,960,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/01\/KALAMARIA_11_19-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station: The works for the reinstatement of PUO networks and the configuration of the surrounding area are in progress. KALAMARIA Station: The following works are in progress: painting works at track level, backfilling of the surrounding area and reinstatement of PUO networks. ARETSOU Station: The works for the construction of metal elements in the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15931"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15931\/revisions"}],"predecessor-version":[{"id":29019,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15931\/revisions\/29019"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15929"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}