{"id":15858,"date":"2019-12-19T15:01:46","date_gmt":"2019-12-19T13:01:46","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=15858"},"modified":"2024-06-25T13:51:46","modified_gmt":"2024-06-25T10:51:46","slug":"november-2019","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=15858&lang=en","title":{"rendered":"NOVEMBER 2019"},"content":{"rendered":"<p><strong><u>DOUBLE TRACK NATM START TUNNEL <\/u><\/strong><\/p>\n<p><strong>Works have been completed. <\/strong><\/p>\n<p><strong><u>KOMNINOU SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch<\/li>\n<li>Street level reinstatement<\/li>\n<\/ul>\n<p><strong><u>AGHIA VARVARA STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Street \u2013 square level reinstatement<\/li>\n<li>Installation of handrails<\/li>\n<li>Other architectural finishes<\/li>\n<\/ul>\n<p><strong><u>MEGALOU ALEXANDROU SHAFT<\/u><\/strong><\/p>\n<p><strong>Works have been completed. <\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Planting (street level)<\/li>\n<\/ul>\n<p><strong><u>TAXIARCHON SHAFT <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of doors<\/li>\n<li>Installation of ceramic tiles<\/li>\n<li>Installation of metal structures<\/li>\n<\/ul>\n<p><strong><u>KORYDALLOS STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of doors<\/li>\n<li>Installation of granites or marbles<\/li>\n<li>Wall and Columns cladding<\/li>\n<li>Installation of ventilation grids<\/li>\n<li>Painting<\/li>\n<\/ul>\n<p><strong><u>NIKEA STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Final reinstatement (slab paving) at level -0 of the street<\/li>\n<li>Roof lining at various levels of the Station<\/li>\n<li>Wall cladding using granite slabs and metal cladding at various levels of the Station.<\/li>\n<\/ul>\n<p><strong><u>\u00a0<\/u><\/strong><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>OPEN CUT OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of staircase S4<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works are still pending: <\/strong><\/p>\n<ul>\n<li>Door installation at the E\/M floor<\/li>\n<li>Waterproofing at street level<\/li>\n<\/ul>\n<p><strong>\u00a0The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Painting at the E\/M floor, at the ticketing and platform levels<\/li>\n<li>Plastering at platform level.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DOUBLE TRACK NATM START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch Street level reinstatement AGHIA VARVARA STATION The following works are in progress: Street \u2013 square level reinstatement Installation of handrails Other architectural finishes MEGALOU ALEXANDROU SHAFT Works have been completed. The following works are still pending: Planting (street level) TAXIARCHON SHAFT The following works are in progress: Installation of doors Installation of ceramic tiles Installation of metal structures KORYDALLOS STATION The following works are in progress: Installation of doors Installation of granites or marbles Wall and Columns cladding Installation of ventilation grids Painting NIKEA STATION MAIN STATION The following works are in progress: Final reinstatement (slab paving) at level -0 of the street Roof lining at various levels of the Station Wall cladding using granite slabs and metal cladding at various levels of the Station. \u00a0MANIATIKA STATION OPEN CUT OF THE STATION The following works are in progress: Permanent lining of E\/M slab (level -3) Permanent lining of staircase S4 DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works are still pending: Door installation at the E\/M floor Waterproofing at street level \u00a0The following works are in progress: Painting at the E\/M floor, at the ticketing and platform levels Plastering at platform level. &nbsp; \u00a0 \u00a0<\/p>\n","protected":false},"author":12,"featured_media":15856,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-15858","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1.jpg",2560,1707,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1.jpg",2560,1707,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1.jpg",2560,1707,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-2048x1366.jpg",2048,1366,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-1140x760.jpg",1140,760,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/12\/IMG_3365-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"DOUBLE TRACK NATM START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry, plastering, door installation, industrial floor, painting, grid installation at street level, staircase balustrades, hatch Street level reinstatement AGHIA VARVARA STATION The following works are in progress: Street \u2013 square level reinstatement Installation of handrails Other architectural finishes&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15858","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15858"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15858\/revisions"}],"predecessor-version":[{"id":31046,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15858\/revisions\/31046"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15856"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15858"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}