{"id":15816,"date":"2019-11-08T12:32:05","date_gmt":"2019-11-08T10:32:05","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=15816"},"modified":"2024-06-25T13:53:40","modified_gmt":"2024-06-25T10:53:40","slug":"october-2019","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=15816&lang=en","title":{"rendered":"OCTOBER 2019"},"content":{"rendered":"<p><strong><u>DOUBLE TRACK <\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong> <strong><u>START TUNNEL <\/u><\/strong><\/p>\n<p><strong>Works<\/strong> <strong>have<\/strong> <strong>been<\/strong> <strong>completed.<\/strong><\/p>\n<p><strong><u>KOMNINOU SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works have been completed<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Masonry works, plastering works, door installation, industrial floor, painting works, installation of grids at street level, staircase balustrades, hatch<\/li>\n<li>Reinstatement at street level<\/li>\n<\/ul>\n<p><strong><u>AGHIA VARVARA STATION<\/u><\/strong><\/p>\n<p><strong>The following works are in progress<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Reinstatement at street level \u2013 Square level (fountain)<\/li>\n<li>Cladding of walls and columns (steel, glass, etc.)<\/li>\n<li>Installation of roller shutters<\/li>\n<li>Installation of handrails<\/li>\n<li>Other architectural finishes<\/li>\n<\/ul>\n<p><strong><u>MEGALOU<\/u><\/strong> <strong><u>ALEXANDROU<\/u><\/strong> <strong><u>SHAFT<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>Works<\/strong> <strong>have<\/strong> <strong>been<\/strong> <strong>completed.<\/strong><\/p>\n<p><strong><u>KORYDALLOS STATION<\/u><\/strong><\/p>\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress:<\/strong><\/p>\n<ul>\n<li>Door installation<\/li>\n<li>Ceramic tiles installation<\/li>\n<li>Granite or marble installation<\/li>\n<li>Handrail installation<\/li>\n<li>Balustrades installation<\/li>\n<\/ul>\n<p><strong><u>NIKEA STATION<\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION<\/u><\/strong><\/p>\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Final reinstatement (slab paving) at the station street level (\u2013 0).<\/li>\n<li>Wall cladding with granite slabs at platform level (\u2013 3).<\/li>\n<li>E\/M works<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO <\/u><\/strong><strong><u>STATION<\/u><\/strong><\/p>\n<p><strong><u>MAIN<\/u><\/strong> <strong><u>STATION<\/u><\/strong><strong><u> \u2013 <\/u><\/strong><strong><u>AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>\u00a0The following works are <\/strong><strong>put<\/strong> <strong>on<\/strong> <strong>hold<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Door installation at E\/M level<\/li>\n<\/ul>\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Preservation of the archaeological finds of the Project<\/li>\n<li>Opening of an exhibition area for the display of the project\u2019s archeological finds at the building located at Pylon Street owned by the Directorate of Antiquities<\/li>\n<\/ul>\n<p><strong><u>ENTRANCE TO KORAI SQUARE AND ACCESS TUNNEL<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress<\/strong><strong>:<\/strong><\/p>\n<ul>\n<li>Construction of a lift termination<\/li>\n<\/ul>\n<p><strong><u>DOUBLE TRACK TBM TUNNEL<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>Works<\/strong> <strong>have<\/strong> <strong>been<\/strong> <strong>completed.<\/strong><\/p>\n<p><strong><u>TRIPLE TRACK NATM TUNNEL<\/u><\/strong><\/p>\n<p><strong><u>DIRECTION UNIVERSITY OF PIRAEUS<\/u><\/strong><\/p>\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>have been completed:<\/strong><\/p>\n<ul>\n<li>Construction of permanent lining<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>DOUBLE TRACK \u039d\u0391\u03a4\u039c START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry works, plastering works, door installation, industrial floor, painting works, installation of grids at street level, staircase balustrades, hatch Reinstatement at street level AGHIA VARVARA STATION The following works are in progress: Reinstatement at street level \u2013 Square level (fountain) Cladding of walls and columns (steel, glass, etc.) Installation of roller shutters Installation of handrails Other architectural finishes MEGALOU ALEXANDROU SHAFT \u00a0Works have been completed. KORYDALLOS STATION The following works are in progress: Door installation Ceramic tiles installation Granite or marble installation Handrail installation Balustrades installation NIKEA STATION MAIN STATION The following works are in progress: Final reinstatement (slab paving) at the station street level (\u2013 0). Wall cladding with granite slabs at platform level (\u2013 3). E\/M works DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE \u00a0The following works are put on hold: Door installation at E\/M level The following works are in progress: Preservation of the archaeological finds of the Project Opening of an exhibition area for the display of the project\u2019s archeological finds at the building located at Pylon Street owned by the Directorate of Antiquities ENTRANCE TO KORAI SQUARE AND ACCESS TUNNEL \u00a0The following works are in progress: Construction of a lift termination DOUBLE TRACK TBM TUNNEL \u00a0Works have been completed. TRIPLE TRACK NATM TUNNEL DIRECTION UNIVERSITY OF PIRAEUS The following works have been completed: Construction of permanent lining<\/p>\n","protected":false},"author":12,"featured_media":15806,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-15816","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-scaled.jpg",2560,1706,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-scaled.jpg",2560,1706,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-scaled.jpg",2560,1706,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-2048x1365.jpg",2048,1365,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-1140x760.jpg",1140,760,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/11\/IMG_0906-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"DOUBLE TRACK \u039d\u0391\u03a4\u039c START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: Masonry works, plastering works, door installation, industrial floor, painting works, installation of grids at street level, staircase balustrades, hatch Reinstatement at street level AGHIA VARVARA STATION The following works are in progress: Reinstatement at street level \u2013 Square&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15816"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15816\/revisions"}],"predecessor-version":[{"id":31048,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15816\/revisions\/31048"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15806"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}