{"id":15242,"date":"2019-05-15T15:03:54","date_gmt":"2019-05-15T12:03:54","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=15242"},"modified":"2024-06-25T14:13:29","modified_gmt":"2024-06-25T11:13:29","slug":"april-2019","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=15242&lang=en","title":{"rendered":"APRIL 2019"},"content":{"rendered":"<p style=\"text-align: right;\">\n<p><strong>\u0391. <\/strong><strong>Tramway <\/strong><\/p>\n<ul>\n<li>The works for the construction of the tramway corridor (trackwork \u2013 rails \u2013 catenary) <strong>have been completed<\/strong>.<\/li>\n<li>The following works are i<strong>n<\/strong> <strong>progress<\/strong>:<\/li>\n<li>The trial run of the Tramway system and the adjustment \u2013 checking of the systems and devices controlling the operation of the Tramway system (for integration of the extension to Piraeus with the basic network).<\/li>\n<li>Road signage and signaling works on junctions along the Tramway route.<\/li>\n<li>The following works are <strong>p<\/strong><strong>ending<\/strong>:<\/li>\n<li>E\/M works at the new Substation 16 (Civil Works have been completed), as well as the upgrading of Substation<\/li>\n<\/ul>\n<p><strong>\u0392<\/strong><strong>.\u00a0\u00a0 <\/strong><strong>OTHER<\/strong> <strong>WORKS<\/strong><strong> (reference to <\/strong><strong>extended work<\/strong> <strong>fronts<\/strong><strong>)<\/strong><\/p>\n<ul>\n<li><strong>Lambraki<\/strong> <strong>Bridge<\/strong>: Concrete maintenance works are in progress.<\/li>\n<li>Platform located in Posidonos Avenue: the special flooring (dispaly of the underlying antiquities)<\/li>\n<li><strong>Along<\/strong> <strong>the<\/strong> <strong>Tramway<\/strong> <strong>route<\/strong> <strong>in<\/strong> <strong>Piraeus<\/strong><strong>, <\/strong>the following works are <strong>in progress<\/strong>:\n<ul>\n<li>the works related to the installation of urban equipment are about to be completed at the stops, as well as the installation-testing of E\/M equipment.<\/li>\n<li>The installation of lifts in the area of Lambraki Bridge and in the area of Karaiskaki stop.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\u0391. Tramway The works for the construction of the tramway corridor (trackwork \u2013 rails \u2013 catenary) have been completed. The following works are in progress: The trial run of the Tramway system and the adjustment \u2013 checking of the systems and devices controlling the operation of the Tramway system (for integration of the extension to Piraeus with the basic network). Road signage and signaling works on junctions along the Tramway route. The following works are pending: E\/M works at the new Substation 16 (Civil Works have been completed), as well as the upgrading of Substation \u0392.\u00a0\u00a0 OTHER WORKS (reference to extended work fronts) Lambraki Bridge: Concrete maintenance works are in progress. Platform located in Posidonos Avenue: the special flooring (dispaly of the underlying antiquities) Along the Tramway route in Piraeus, the following works are in progress: the works related to the installation of urban equipment are about to be completed at the stops, as well as the installation-testing of E\/M equipment. The installation of lifts in the area of Lambraki Bridge and in the area of Karaiskaki stop.<\/p>\n","protected":false},"author":6,"featured_media":14993,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-15242","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-scaled.jpg",2560,1603,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-scaled.jpg",2560,1603,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-scaled.jpg",2560,1603,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-300x188.jpg",300,188,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-1024x641.jpg",960,601,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-1536x962.jpg",1536,962,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-2048x1283.jpg",2048,1283,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-1140x714.jpg",1140,714,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/05\/Untitled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"vbardamaskou","author_link":"https:\/\/www.emetro.gr\/?author=6"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"\u0391. Tramway The works for the construction of the tramway corridor (trackwork \u2013 rails \u2013 catenary) have been completed. The following works are in progress: The trial run of the Tramway system and the adjustment \u2013 checking of the systems and devices controlling the operation of the Tramway system (for integration of the extension to&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15242"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15242\/revisions"}],"predecessor-version":[{"id":19728,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/15242\/revisions\/19728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/14993"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}