{"id":14456,"date":"2018-12-11T13:41:28","date_gmt":"2018-12-11T11:41:28","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=14456"},"modified":"2024-05-28T13:35:29","modified_gmt":"2024-05-28T10:35:29","slug":"november-2018-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=14456&lang=en","title":{"rendered":"NOVEMBER 2018"},"content":{"rendered":"<p style=\"text-align: right;\">\n<ul>\n<li><strong>NEW RAILWAY Station:<\/strong> The works for the installation of ceramic tiles in other station levels as well are at an advanced stage.<\/li>\n<li><strong>DIMOKRATIAS Station (Station and Crossover):<\/strong> Floor cladding works using granite slabs are in progress.<\/li>\n<li><strong>VENIZELOU Station:<\/strong> Works for burring of archaeological finds and archaeological survey related works at the west and east ends are in progress.<\/li>\n<\/ul>\n<ul>\n<li><strong>AGHIA SOFIA Station: <\/strong>Completed are the execution of the 6<sup>th<\/sup> traffic regulation and the removal of the struts at level -1 of the station.<\/li>\n<li><strong>SINTRIVANI Station:<\/strong> Works for the construction of walls in the area surrounding the north access of the station have been completed.<\/li>\n<li><strong>PANEPISTIMIO Station:<\/strong> Wall cladding works using granite slabs are in progress.<\/li>\n<li><strong>PAPAFI Station:<\/strong> Wall cladding works using granite slabs are in progress.<\/li>\n<li><strong>EFKLIDIS Station:<\/strong> Painting works continue, while E\/M installation works are in progress.<\/li>\n<li><strong>FLEMING Station:<\/strong> Wall cladding works using granite slabs, as well as E\/M installation works are in progress.<\/li>\n<li><strong>25 MARTIOU Station (station &amp; crossover):<\/strong> Works for the construction of masonry walls at track level are in progress.<\/li>\n<li><strong>VOULGARI Station:<\/strong> Door installation works and painting works are in progress.\n<ul>\n<li><strong>Depot:<\/strong>\n<ul>\n<li><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399<\/strong><strong>:<\/strong> The works for the installation of door frames and cladding of facades are in progress, while works for the construction of side covering panels have commenced.<\/li>\n<li><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399\u0399<\/strong><strong>:<\/strong> The works for the application of marble cladding, the construction of gypsum boards and false ceiling have commenced.<\/li>\n<\/ul>\n<\/li>\n<li><strong>\u03a4\u0392\u039c<\/strong> <strong>tunnels<\/strong><strong>:<\/strong> The works for the construction of pumping stations and the construction of trackwork at a section of the tunnels are in progress.<\/li>\n<li><strong>C&amp;C and NATM<\/strong> <strong>tunnels: <\/strong>Works for the reinstatement of the surrounding area at surface level, roadworks and backfilling works are in progress.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NEW RAILWAY Station: The works for the installation of ceramic tiles in other station levels as well are at an advanced stage. DIMOKRATIAS Station (Station and Crossover): Floor cladding works using granite slabs are in progress. VENIZELOU Station: Works for burring of archaeological finds and archaeological survey related works at the west and east ends are in progress. AGHIA SOFIA Station: Completed are the execution of the 6th traffic regulation and the removal of the struts at level -1 of the station. SINTRIVANI Station: Works for the construction of walls in the area surrounding the north access of the station have been completed. PANEPISTIMIO Station: Wall cladding works using granite slabs are in progress. PAPAFI Station: Wall cladding works using granite slabs are in progress. EFKLIDIS Station: Painting works continue, while E\/M installation works are in progress. FLEMING Station: Wall cladding works using granite slabs, as well as E\/M installation works are in progress. 25 MARTIOU Station (station &amp; crossover): Works for the construction of masonry walls at track level are in progress. VOULGARI Station: Door installation works and painting works are in progress. Depot: Building Complex \u0399: The works for the installation of door frames and cladding of facades are in progress, while works for the construction of side covering panels have commenced. Building Complex \u0399\u0399: The works for the application of marble cladding, the construction of gypsum boards and false ceiling have commenced. \u03a4\u0392\u039c tunnels: The works for the construction of pumping stations and the construction of trackwork at a section of the tunnels are in progress. C&amp;C and NATM tunnels: Works for the reinstatement of the surrounding area at surface level, roadworks and backfilling works are in progress.<\/p>\n","protected":false},"author":9,"featured_media":14441,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-14456","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-scaled.jpg",1920,2560,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-scaled.jpg",1920,2560,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-scaled.jpg",1920,2560,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-768x1024.jpg",768,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-1152x1536.jpg",1152,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-1536x2048.jpg",1536,2048,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-1140x1520.jpg",1140,1520,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/12\/AM_Thess_Nov18-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"NEW RAILWAY Station: The works for the installation of ceramic tiles in other station levels as well are at an advanced stage. DIMOKRATIAS Station (Station and Crossover): Floor cladding works using granite slabs are in progress. VENIZELOU Station: Works for burring of archaeological finds and archaeological survey related works at the west and east ends&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/14456","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14456"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/14456\/revisions"}],"predecessor-version":[{"id":20025,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/14456\/revisions\/20025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/14441"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14456"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14456"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}