{"id":10685,"date":"2018-06-19T14:20:05","date_gmt":"2018-06-19T11:20:05","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=10685"},"modified":"2024-06-25T12:59:28","modified_gmt":"2024-06-25T09:59:28","slug":"may-2018-4","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=10685&lang=en","title":{"rendered":"May 2018"},"content":{"rendered":"<p style=\"text-align: right;\">\n<p>Kritis shaft: The excavation and temporary retaining of the pumping station have been completed.<\/p>\n<p>\u2022 NOMARCHIA Station: Completed are the construction of the permanent lining of the north access, as well as the construction of industrial floors at level -2. The backfilling and construction of PUO networks in the area of the north access are in progress.<\/p>\n<p>\u2022 KALAMARIA Station: Completed are the works for the excavation and temporary retaining of the SE ventilation shaft, for the construction of the west access and masonry works at level -2, as well as E\/M installation works (sewerage of WC areas). The waterproofing of the SE ventilation shaft and the construction of the platform are in progress.<\/p>\n<p>\u2022 ARETSOU Station: The construction of the west access and the E\/M installations (sewerage of WC areas) have been completed. In progress is the construction of industrial floors and of walls \/ parapet walls at street level at the east access.<\/p>\n<p>\u2022 NEA KRINI Station: The construction of industrial floors is in progress.<\/p>\n<p>\u2022 MIKRA Station (&amp; crossovers): Works for E\/M installations \u2013 sewerage of sanitary areas have been completed. The construction of the south and NE accesses is in progress.<\/p>\n<p>\u2022 TBM tunnels: Tunnel 1 boring works (TBM1 &#8211; \u2018Frixos\u2019) are in progress at \u2018Nomarchia \u2013 25 Martiou Crossover\u2019 tunnel section.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kritis shaft: The excavation and temporary retaining of the pumping station have been completed. \u2022 NOMARCHIA Station: Completed are the construction of the permanent lining of the north access, as well as the construction of industrial floors at level -2. The backfilling and construction of PUO networks in the area of the north access are in progress. \u2022 KALAMARIA Station: Completed are the works for the excavation and temporary retaining of the SE ventilation shaft, for the construction of the west access and masonry works at level -2, as well as E\/M installation works (sewerage of WC areas). The waterproofing of the SE ventilation shaft and the construction of the platform are in progress. \u2022 ARETSOU Station: The construction of the west access and the E\/M installations (sewerage of WC areas) have been completed. In progress is the construction of industrial floors and of walls \/ parapet walls at street level at the east access. \u2022 NEA KRINI Station: The construction of industrial floors is in progress. \u2022 MIKRA Station (&amp; crossovers): Works for E\/M installations \u2013 sewerage of sanitary areas have been completed. The construction of the south and NE accesses is in progress. \u2022 TBM tunnels: Tunnel 1 boring works (TBM1 &#8211; \u2018Frixos\u2019) are in progress at \u2018Nomarchia \u2013 25 Martiou Crossover\u2019 tunnel section.<\/p>\n","protected":false},"author":4,"featured_media":10671,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-10685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018.jpg",2000,1557,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018.jpg",2000,1557,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018.jpg",2000,1557,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-300x234.jpg",300,234,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-1024x797.jpg",960,747,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-1536x1196.jpg",1536,1196,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018.jpg",2000,1557,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-1140x887.jpg",1140,887,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/06\/KALAMARIA_05_2018-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"Kritis shaft: The excavation and temporary retaining of the pumping station have been completed. \u2022 NOMARCHIA Station: Completed are the construction of the permanent lining of the north access, as well as the construction of industrial floors at level -2. The backfilling and construction of PUO networks in the area of the north access are&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10685"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10685\/revisions"}],"predecessor-version":[{"id":19752,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10685\/revisions\/19752"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/10671"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}