{"id":10230,"date":"2018-03-19T10:51:37","date_gmt":"2018-03-19T08:51:37","guid":{"rendered":"https:\/\/www.emetro.gr?p=10230"},"modified":"2024-06-25T13:03:53","modified_gmt":"2024-06-25T10:03:53","slug":"february-2018-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=10230&lang=en","title":{"rendered":"February 2018"},"content":{"rendered":"<p style=\"text-align: right;\">[responsivevoice_button voice=&#8221;UK English Female&#8221; buttontext=&#8221;Listen to post&#8221;]\n<ul>\n<li>NEW RAILWAY Station: Implementation of traffic phase E\u2019, as well as plastering and masonry wall related works have been completed. The works for the construction of shaft terminations are in progress.<\/li>\n<\/ul>\n<p>\u2022 AGHIA SOFIA Station &#8211; north access: The archaeological excavation in progress.<\/p>\n<p>\u2022 SINTRIVANI Station \u2013 EXPO: The excavation and temporary retaining works at the south access have been completed. The the construction of the south access and E\/M installations are in progress.<\/p>\n<p>\u2022 PANEPISTIMIO Station: Masonry works are in progress.<\/p>\n<p>\u2022 PAPAFI Station: The implementation of traffic phase E\u2019 has been completed, while the reinstatement of the central traffic island on Karamanli Avenue is in progress.<\/p>\n<p>\u2022 FLEMING Station: Masonry works and the implementation of traffic phase E\u2019 have been completed. Door installation works are in progress.<\/p>\n<p>\u2022 25 MARTIOU Station &amp; Crossover: Plastering works are in progress.<\/p>\n<p>\u2022 VOULGARI Station: Masonry works and the installation of escalators are in progress.<\/p>\n<p>\u2022 NEA ELVETIA Station and Crossover: Works for the construction of PPC manhole in the station, as well as crossover masonry works are in progress.<\/p>\n<p>\u2022 Depot &#8211; Building Complex I: The construction of the metal structure roof, plastering works in the washing plant and works related to E\/M installations are in progress. Building Complex II: The following works are in progress: metal roof painting works using fire resistant paint, masonry, plastering and painting works, as well as works related to E\/M installations. In the surrounding area, the construction of E\/M routing infrastructure and the backfilling between complexes IK and II are in progress.<\/p>\n<p>\u2022 TBM Tunnels: The works for the construction of the tunnel walkways\u2019 foundation are in progress from ANALIPSI Station to SINTRIVANI Crossover.<\/p>\n<p>\u2022 Cut &amp; Cover (C&amp;C) and NATM Tunnels &#8211; Section I: Joint sealing works are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[responsivevoice_button voice=&#8221;UK English Female&#8221; buttontext=&#8221;Listen to post&#8221;] NEW RAILWAY Station: Implementation of traffic phase E\u2019, as well as plastering and masonry wall related works have been completed. The works for the construction of shaft terminations are in progress. \u2022 AGHIA SOFIA Station &#8211; north access: The archaeological excavation in progress. \u2022 SINTRIVANI Station \u2013 EXPO: The excavation and temporary retaining works at the south access have been completed. The the construction of the south access and E\/M installations are in progress. \u2022 PANEPISTIMIO Station: Masonry works are in progress. \u2022 PAPAFI Station: The implementation of traffic phase E\u2019 has been completed, while the reinstatement of the central traffic island on Karamanli Avenue is in progress. \u2022 FLEMING Station: Masonry works and the implementation of traffic phase E\u2019 have been completed. Door installation works are in progress. \u2022 25 MARTIOU Station &amp; Crossover: Plastering works are in progress. \u2022 VOULGARI Station: Masonry works and the installation of escalators are in progress. \u2022 NEA ELVETIA Station and Crossover: Works for the construction of PPC manhole in the station, as well as crossover masonry works are in progress. \u2022 Depot &#8211; Building Complex I: The construction of the metal structure roof, plastering works in the washing plant and works related to E\/M installations are in progress. Building Complex II: The following works are in progress: metal roof painting works using fire resistant paint, masonry, plastering and painting works, as well as works related to E\/M installations. In the surrounding area, the construction of E\/M routing infrastructure and the backfilling between complexes IK and II are in progress. \u2022 TBM Tunnels: The works for the construction of the tunnel walkways\u2019 foundation are in progress from ANALIPSI Station to SINTRIVANI Crossover. \u2022 Cut &amp; Cover (C&amp;C) and NATM Tunnels &#8211; Section I: Joint sealing works are in progress.<\/p>\n","protected":false},"author":4,"featured_media":10194,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-10230","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1.jpg",1237,2508,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1.jpg",1237,2508,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1.jpg",1237,2508,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-148x300.jpg",148,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-505x1024.jpg",505,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-758x1536.jpg",758,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-1010x2048.jpg",1010,2048,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-1140x2311.jpg",1140,2311,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/THESSALONIKI_2_18-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"[responsivevoice_button voice=&#8221;UK English Female&#8221; buttontext=&#8221;Listen to post&#8221;] NEW RAILWAY Station: Implementation of traffic phase E\u2019, as well as plastering and masonry wall related works have been completed. The works for the construction of shaft terminations are in progress. \u2022 AGHIA SOFIA Station &#8211; north access: The archaeological excavation in progress. \u2022 SINTRIVANI Station \u2013 EXPO:&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10230"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10230\/revisions"}],"predecessor-version":[{"id":31014,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10230\/revisions\/31014"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/10194"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}