{"id":10228,"date":"2018-03-19T10:47:51","date_gmt":"2018-03-19T08:47:51","guid":{"rendered":"https:\/\/www.emetro.gr?p=10228"},"modified":"2024-06-25T13:04:16","modified_gmt":"2024-06-25T10:04:16","slug":"february-2018-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=10228&lang=en","title":{"rendered":"February 2018"},"content":{"rendered":"<p style=\"text-align: right;\">\n<p>A. With regard to the TRAMWAY CORRIDOR:<\/p>\n<p>In the remaining areas of the entire Tramway network:<\/p>\n<p>\u2022 Tramway corridor works have been completed:<\/p>\n<p>&#8211; at N. Faliro stop (installation of turnouts and connection of the Tramway extension to Piraeus with the operating tramway network)<br \/>\n&#8211; at Mousson Street (installation of a turnout for optimum operation of the Tramway extension to Piraeus)<br \/>\n&#8211; at Syntagma (amended terminal stop)<\/p>\n<p>\u2022 In progress are works for the completion of the urban planning at Syntagma terminal stop.<\/p>\n<p>B. With regard to other work fronts:<\/p>\n<p>\u2022 Along the Tramway corridor, in progress are:<\/p>\n<p>&#8211; works for the maintenance of manholes on asphalt road pavements<br \/>\n&#8211; the installation of tramway signalling system at signalled junctions located along the tramway corridor.<\/p>\n<p>\u2022 At Akti Possidonos Street, in progress are:<\/p>\n<p>&#8211; archaeological excavation works<br \/>\n&#8211; works for the relocation of PUO networks, the construction of tramway corridor and urban planning.<\/p>\n<p>\u2022 At Vas. Georgiou &amp; Ethn. Antistasseos junction in progress are:<\/p>\n<p>&#8211; archaeological excavation works<br \/>\n&#8211; works for the relocation of PUO networks, the construction of tramway corridor.<\/p>\n<p>\u2022 SEF stop and Alikakou square:<br \/>\n&#8211; planting and urban planning works have been completed.<br \/>\n&#8211; works for the construction of other foreseen structures (serving the needs of the stop, etc.).<\/p>\n<p>\u2022 In various Piraeus areas, in progress are works for the installation of underground waste bins.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A. With regard to the TRAMWAY CORRIDOR: In the remaining areas of the entire Tramway network: \u2022 Tramway corridor works have been completed: &#8211; at N. Faliro stop (installation of turnouts and connection of the Tramway extension to Piraeus with the operating tramway network) &#8211; at Mousson Street (installation of a turnout for optimum operation of the Tramway extension to Piraeus) &#8211; at Syntagma (amended terminal stop) \u2022 In progress are works for the completion of the urban planning at Syntagma terminal stop. B. With regard to other work fronts: \u2022 Along the Tramway corridor, in progress are: &#8211; works for the maintenance of manholes on asphalt road pavements &#8211; the installation of tramway signalling system at signalled junctions located along the tramway corridor. \u2022 At Akti Possidonos Street, in progress are: &#8211; archaeological excavation works &#8211; works for the relocation of PUO networks, the construction of tramway corridor and urban planning. \u2022 At Vas. Georgiou &amp; Ethn. Antistasseos junction in progress are: &#8211; archaeological excavation works &#8211; works for the relocation of PUO networks, the construction of tramway corridor. \u2022 SEF stop and Alikakou square: &#8211; planting and urban planning works have been completed. &#8211; works for the construction of other foreseen structures (serving the needs of the stop, etc.). \u2022 In various Piraeus areas, in progress are works for the installation of underground waste bins.<\/p>\n","protected":false},"author":4,"featured_media":10190,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-10228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-scaled.jpg",2560,1609,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-scaled.jpg",2560,1609,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-scaled.jpg",2560,1609,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-300x189.jpg",300,189,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-1024x643.jpg",960,603,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-1536x965.jpg",1536,965,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-2048x1287.jpg",2048,1287,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-1140x716.jpg",1140,716,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_2_18-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"A. With regard to the TRAMWAY CORRIDOR: In the remaining areas of the entire Tramway network: \u2022 Tramway corridor works have been completed: &#8211; at N. Faliro stop (installation of turnouts and connection of the Tramway extension to Piraeus with the operating tramway network) &#8211; at Mousson Street (installation of a turnout for optimum operation&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10228"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10228\/revisions"}],"predecessor-version":[{"id":20054,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10228\/revisions\/20054"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/10190"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}