{"id":10152,"date":"2018-02-19T16:39:22","date_gmt":"2018-02-19T14:39:22","guid":{"rendered":"https:\/\/www.emetro.gr?p=10152"},"modified":"2024-06-25T13:06:04","modified_gmt":"2024-06-25T10:06:04","slug":"january-2018-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=10152&lang=en","title":{"rendered":"January 2018"},"content":{"rendered":"<p style=\"text-align: right;\">\n<p>A. With regard to the TRAMWAY CORRIDOR:<\/p>\n<p>\u2022 The following works have been completed:<\/p>\n<p>Tramway corridor (trackwork \u2013 rails, infrastructure works for multiple ducts and foundation of catenary poles)<br \/>\n&#8211; at Ethnarhou Makariou street (from N. Faliro stop \u2013connection with the beginning of the extension- to Papandreou bridge)<br \/>\n&#8211; at Papandreou bridge<br \/>\n&#8211; at Mikras Asias street (including Lambraki U-turn and the pocket)<br \/>\n&#8211; at Gr. Lambraki street (from Lambraki bridge to Vas. Georgiou street)<br \/>\n&#8211; at the crossing from Gr. Lambraki street to Georgiou street<br \/>\n&#8211; at Vas. Georgiou street (Lambraki street, ahead of Filonos street)<br \/>\n&#8211; at Ethn. Antistaseos street (Georgiou street \u2013 Ippodamias street)<br \/>\n&#8211; at Om. Skylitsi street (Ippodamias street \u2013 34ou Syntagmatos street \u2013 Tzavella street \u2013 Tzavella pedestrian passage \u2013 Peace and Friendship Stadium (SEF))<br \/>\n&#8211; at Myrtidiotissa bridge to the point of connection with the existing Tramway line at SEF.<\/p>\n<p>\u2022 In progress are the following works:<\/p>\n<p>&#8211; Installation of catenary poles serving the Traction Power Overhead Line in the aforementioned areas where the Tramway corridor has been completed.<br \/>\n&#8211; Tramway corridor (earthworks \u2013 trackwork), at the intersection of Vas. Georgiou and Ethnikis Antistasseos streets.<br \/>\n&#8211; Tramway corridor (earthworks \u2013 trackwork) at Syntagma terminal stop area.<\/p>\n<p>B. With regard to other work fronts:<\/p>\n<p>&#8211; Akti Possidonos street: the archaeological excavation in the area of the terminal stop, the works for the relocation of PUO networks, as well as the construction of trackwork on the Tramway corridor are in progress.<br \/>\n&#8211; Intersection of Vas. Georgiou &amp; Ethn. Antistasseos streets: the archaeological excavation, the relocation of PUO networks, as well as the construction of trackwork on the Tramway corridor are in progress.<br \/>\n&#8211; SEF stop and Alikakou square: planting and urban planning works have been completed. Works for the installation of containers to serve SEF stop are in progress.<br \/>\n&#8211; Syntagma area: PUO works and works for the configuration of the west sidewalk of Amalias Avenue \u2013 Xenofontos street \u2013 Othonos street have been completed; works for the re-configuration of the Tramway corridor and the Tramway stop are in progress.<br \/>\nIn various Piraeus areas, in progress are works for the installation of underground waste bins.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A. With regard to the TRAMWAY CORRIDOR: \u2022 The following works have been completed: Tramway corridor (trackwork \u2013 rails, infrastructure works for multiple ducts and foundation of catenary poles) &#8211; at Ethnarhou Makariou street (from N. Faliro stop \u2013connection with the beginning of the extension- to Papandreou bridge) &#8211; at Papandreou bridge &#8211; at Mikras Asias street (including Lambraki U-turn and the pocket) &#8211; at Gr. Lambraki street (from Lambraki bridge to Vas. Georgiou street) &#8211; at the crossing from Gr. Lambraki street to Georgiou street &#8211; at Vas. Georgiou street (Lambraki street, ahead of Filonos street) &#8211; at Ethn. Antistaseos street (Georgiou street \u2013 Ippodamias street) &#8211; at Om. Skylitsi street (Ippodamias street \u2013 34ou Syntagmatos street \u2013 Tzavella street \u2013 Tzavella pedestrian passage \u2013 Peace and Friendship Stadium (SEF)) &#8211; at Myrtidiotissa bridge to the point of connection with the existing Tramway line at SEF. \u2022 In progress are the following works: &#8211; Installation of catenary poles serving the Traction Power Overhead Line in the aforementioned areas where the Tramway corridor has been completed. &#8211; Tramway corridor (earthworks \u2013 trackwork), at the intersection of Vas. Georgiou and Ethnikis Antistasseos streets. &#8211; Tramway corridor (earthworks \u2013 trackwork) at Syntagma terminal stop area. B. With regard to other work fronts: &#8211; Akti Possidonos street: the archaeological excavation in the area of the terminal stop, the works for the relocation of PUO networks, as well as the construction of trackwork on the Tramway corridor are in progress. &#8211; Intersection of Vas. Georgiou &amp; Ethn. Antistasseos streets: the archaeological excavation, the relocation of PUO networks, as well as the construction of trackwork on the Tramway corridor are in progress. &#8211; SEF stop and Alikakou square: planting and urban planning works have been completed. Works for the installation of containers to serve SEF stop are in progress. &#8211; Syntagma area: PUO works and works for the configuration of the west sidewalk of Amalias Avenue \u2013 Xenofontos street \u2013 Othonos street have been completed; works for the re-configuration of the Tramway corridor and the Tramway stop are in progress. In various Piraeus areas, in progress are works for the installation of underground waste bins.<\/p>\n","protected":false},"author":4,"featured_media":10140,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-10152","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-scaled.jpg",1920,2560,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-scaled.jpg",1920,2560,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-scaled.jpg",1920,2560,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-768x1024.jpg",768,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-1152x1536.jpg",1152,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-1536x2048.jpg",1536,2048,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-1140x1520.jpg",1140,1520,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2018\/03\/TRAM_01_18-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"A. With regard to the TRAMWAY CORRIDOR: \u2022 The following works have been completed: Tramway corridor (trackwork \u2013 rails, infrastructure works for multiple ducts and foundation of catenary poles) &#8211; at Ethnarhou Makariou street (from N. Faliro stop \u2013connection with the beginning of the extension- to Papandreou bridge) &#8211; at Papandreou bridge &#8211; at Mikras&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10152"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10152\/revisions"}],"predecessor-version":[{"id":20058,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/10152\/revisions\/20058"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/10140"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}