{"id":4182,"date":"2016-05-06T06:23:44","date_gmt":"2016-05-06T03:23:44","guid":{"rendered":"https:\/\/www.emetro.gr\/?page_id=4182&#038;lang=en"},"modified":"2024-10-11T14:21:38","modified_gmt":"2024-10-11T11:21:38","slug":"line-3-2","status":"publish","type":"page","link":"https:\/\/www.emetro.gr\/?page_id=4182&lang=en","title":{"rendered":"Line 3"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"4182\" class=\"elementor elementor-4182\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-7e9f0e8f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7e9f0e8f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-230d3808\" data-id=\"230d3808\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-39b51913 elementor-widget elementor-widget-text-editor\" data-id=\"39b51913\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h5 class=\"ContentTitle\" style=\"text-align: justify;\"><span style=\"color: #000000;\">LINE 3 (EGALEO \u2013 DOUKISSIS PLAKENTIAS \u2013 AIRPORT)<\/span><\/h5><p style=\"text-align: justify;\" align=\"justify\"><span style=\"color: #000000;\">The construction of Line 3 commenced in November 1992. The 7 first stations of the Line in SYNTAGMA \u2013 ETHNIKI AMYNA section were handed over to the public in January 2000, while the last section of the Base Project, SYNTAGMA \u2013 MONASTIRAKI section comprising of 1.4km of tunnel and one station, was commissioned in April 2003.<\/span><\/p><h5 class=\"newstitle\" style=\"text-align: justify;\"><span style=\"color: #000000;\">ETHNIKI AMYNA \u2013 DOUKISSIS PLAKENTIAS \u2013 AIRPORT EXTENSION<\/span><\/h5><p style=\"text-align: justify;\"><span style=\"color: #000000;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-793 size-medium alignleft\" src=\"http:\/\/emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-douk-plakentias_LG-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-douk-plakentias_LG-300x201.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-douk-plakentias_LG.jpg 726w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ETHNIKI AMYNA\u2013DOUKISSIS PLAKENTIAS\u2013AIRPORT extension is a section of the Athens Metro Line 3 covering an underground route of 5,9 km long up to DOUKISSIS PLAKENTIAS Station. At this point, the Metro trains emerge at the surface level and cover a distance of 20.7 km- using the Suburban Railway network- in order to reach ELEFTHERIOS VENIZELOS International Airport.<\/span><\/p><p>\u00a0<\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">Line 3 extension from ETHNIKI AMYNA to DOUKISSIS PLAKENTIAS includes 5 stations: HOLARGOS, NOMISMATOKOPIO, AGHIA PARASKEVI, HALANDRI and DOUKISSIS PLAKENTIAS. NOMISMATOKOPIO Station was commissioned early September 2009, HOLARGOS Station mid July 2010, while AGHIA PARASKEVI Station at the end of December 2010.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">At the same time, a new Depot (covering a area of 60, 000 sq.m.) was constructed to serve the needs of Line 3 in the area of Doukissis Plakentias, which is connected to DOUKISSIS PLAKENTIAS Station via a tunnel, 200m long.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">With regard to this extension, it is worth mentioning that:<\/span><\/p><ul style=\"text-align: justify;\"><li><span style=\"color: #000000;\">HALANDRI Station has been constructed in such a way so as to enable the future lowering of Plakentias Avenue (Pentelis Avenue).<\/span><\/li><li><span style=\"color: #000000;\">DOUKISSIS PLAKENTIAS Station is located below the multi-level junction of Attiki Odos.<\/span><\/li><li><span style=\"color: #000000;\">Compatibility between the Suburban Railway and the Metro line. The underground tunnel, which continues past DOUKISSIS PLAKENTIAS Station, emerges at the median of Attiki Odos. At this location, a provision was made to make a connection with the Suburban Railway line, which requires special systems layouts for the smooth changeover of the metro trains to the suburban railway network.<\/span><\/li><li><span style=\"color: #000000;\">ELEFTHERIOS VENIZELOS Airport Station serves the suburban railway and the Metro trains from different platforms. Moreover, there is a direct connection with the main Airport building.<\/span><\/li><li><span style=\"color: #000000;\">The distance between Monastiraki Station and the Airport is covered today in just 37 minutes.<\/span><\/li><li><span style=\"color: #000000;\">ETHNIKI AMYNA \u2013 DOUKISSIS PLAKENTIAS \u2013 ELEFTHERIOS VENIZELOS AIRPORT extension serves 55, 000 passengers on a daily basis<\/span><\/li><\/ul><h5 style=\"text-align: justify;\"><span style=\"color: #000000;\">MONASTIRAKI \u2013 EGALEO EXTENSION<\/span><\/h5><p style=\"text-align: justify;\"><span style=\"color: #000000;\"><img decoding=\"async\" class=\"wp-image-794 size-medium alignleft\" src=\"http:\/\/emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-egaleo_LG-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-egaleo_LG-300x225.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-egaleo_LG-768x576.jpg 768w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-egaleo_LG-600x450.jpg 600w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-egaleo_LG.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Line 3 Extension from Monastiraki to Egaleo is considered to be the most important transportation project in the western suburbs of the city. Regions not properly served by public transportation modes and less developed, exhibiting heavy traffic and quite extensive environmental pollution (Iera Odos and Thivon) are now enhanced thanks to the Metro operation. The Line extension is 4.2 km long and includes 3 stations (KERAMIKOS, ELEONAS &amp; EGALEO) and seven ventilation shafts. The Project was commissioned on May 26th 2007 and the western suburbs of Athens are now directly connected with the International Airport \u201cELEFTHERIOS VENIZELOS\u201d.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">All three new stations are characterized by high aesthetics, while their areas are of particular architectural layout. The stations are decorated with stations-specific works of art. In particular, KERAMIKOS Station is decorated with the work of Yiannis Bouteas entitled \u201cDiastromatossis\u2013Energiakes ikones-XVI\u201d, ELEONAS Station with the work of George Lazongas entitled \u201cDiadromes\u201d and EGALEO Station with the works of the late artistOpy Zouni entitled \u201cKiones \u2013 Skies\u201d and \u201cTesseris Pyles ston xoro\u201d. In the aforementioned stations, specially designed areas have been also formed where the most significant archaeological finds from the excavations are to be displayed.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">The benefits from the operation of the extension to Egaleo are numerous:<\/span><\/p><ul style=\"text-align: justify;\"><li><span style=\"color: #000000;\">Easy, rapid and reliable access to the city center. It is worth mentioning that the distance from Egaleo to Syntagma, currently covered by car in at least 40 minutes during rush hours, will be now covered in only 7 minutes by Metro!<\/span><\/li><li><span style=\"color: #000000;\">Connection of the Western Suburbs with Athens International Airport ELEFTHERIOS VENIZELOS.<\/span><\/li><li><span style=\"color: #000000;\">Mitigation of traffic problems and environmental pollution.<\/span><\/li><li><span style=\"color: #000000;\">Display of our cultural legacy in areas inside and outside the new Metro Stations.<\/span><\/li><li><span style=\"color: #000000;\">Re-development of the squares occupied for the project construction needs.<\/span><\/li><\/ul><p style=\"text-align: justify;\"><span style=\"color: #000000;\"><img decoding=\"async\" class=\"wp-image-795 size-medium alignleft\" src=\"http:\/\/emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-kerameikos_LG-300x224.jpg\" alt=\"\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-kerameikos_LG-300x224.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-kerameikos_LG-768x574.jpg 768w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-kerameikos_LG-600x450.jpg 600w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-kerameikos_LG.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>New commercial activities are already developed in the surrounding area of the Metro stations, while the fact that the new stations are of high aesthetics will contribute to the upgrading of the image of the wider area.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">Moreover, ELLINIKO METRO S.A. proceeded with the new configuration of Egaleo Square underneath of which the new Metro Station is located. An underground parking facility of a capacity of 400 places for private vehicles shall be constructed adjacent to this Square for Metro transferring purposes. A similar parking facility shall also be constructed in ELEONAS Station. Finally,an underground modern 5-storey parking facility with a capacity of 270 private vehicles has been constructed in Keramikos and is expected to be delivered to the public soon.<\/span><\/p><h5 style=\"text-align: justify;\"><span style=\"color: #000000;\">EGALEO &#8211; AGHIA MARINA EXTENSION<\/span><\/h5><p style=\"text-align: justify;\"><span style=\"color: #000000;\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-792 size-medium alignleft\" src=\"http:\/\/emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-ag-marina_LG-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-ag-marina_LG-300x200.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-ag-marina_LG-768x512.jpg 768w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/05\/AM_grammi-3-ag-marina_LG.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>In December 2013, ELLINIKO METRO S.A. commissioned a new 1.4km long extension of Line 3 from EGALEO Station to AGHIA MARINA Station (Municipality of Aghia Varvara). AGHIA MARINA Station serves more than 30,000 passengers\/day and it is estimated that the total daily ridership in Aghia Marina-Monastiraki Line 3 section exceeds 100,000 persons. Travel time between SYNTAGMA \u2013 AGHIA MARINA Stations is 8 min; this extension ensures transportation services to\/from the wider area of Egaleo, Haidari and Aghia Varvara Municipalities and, in particular, to\/from the Hospital for Infectious Diseases, Dromokaitio Hospital, Attikon Hospital, facilitating at the same time all commercial activities developed in the area.<\/span><\/p><p>\u00a0<\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">Through this Metro extension to one more area of the Western Suburbs of Attica region, ELLINIKO METRO S.A. provides the optimum possible transportation services to the involved Municipalities, offers rapid and safe transportation, and actually upgrades these areas.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">Moreover, Eleonas Depot, extending over a total area of 86,000m2, was also constructed in the framework of this contract, a project indispensable for Line 3; this Depot is already operating and serving the Metro network. It is also noted that in the area of the underground Eleonas Depot, ELLINIKO METRO S.A. has undertaken the construction of the Central Intercity Bus Terminal.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"color: #000000;\">Finally, in the framework of this contract, a Transfer Station\/Parking Facility with capacity of 382 places was constructed next to AGHIA MARINA Station and delivered to the public in April 2014. This Transfer Station\/Parking Facility serves the park-and-ride needs of citizens of Aghia Varvara, Egaleo and Haidari Municipalities and of the wider Western Attica region (Elefsina, Mandra etc.). This is a six-storey parking facility: one of these storeys is underground and operates in accordance with the highest safety standards for maximum passenger comfort.<\/span><\/p><p>\u00a0<\/p><h5><span style=\"color: #000000;\">Aghia Marina \u2013 Dimotiko Theatro Extension<\/span><\/h5><p><span style=\"color: #000000;\">Metro Line 3 Extension \u201cAghia Marina \u2013 Dimotiko Theatro\u201d includes a 7.6 km long tunnel, 6 new modern stations (AGHIA VARVARA, KORYDALLOS, NIKEA, MANIATIKA, PIRAEUS and DIMOTIKO THEATRO) and 7 ventilation intershafts.<\/span><\/p><p><span style=\"color: #000000;\">This is a 730,000,000.00 EURO investment project in areas of the Municipality of Piraeus and in other municipalities of Piraeus greater area (Nikea, Korydallos, Aghia Varvara), which were faced in the past with severe traffic congestion and were poorly served by public transport.<\/span><\/p><p><span style=\"color: #000000;\">As of July 6<sup>th<\/sup> \u00a02020, the first 3 stations of the Metro Extension to Piraeus, namely AGHIA VARVARA, KORYDALLOS and NIKEA, have been delivered to the public. The commissioned stations were designed by ELLINIKO METRO S.A. with priority given to bioclimatic features and to the safe circulation of the passengers in the Metro network.<\/span><\/p><p><span style=\"color: #000000;\">Since the commissioning of the three first stations of Piraeus extension, it is estimated that the number of passengers using the Metro network was increased by 63,000 on a daily basis, while the residents of Aghia Varvara, Korydallos and Nikea municipalities now benefit from a modern Metro line.<\/span><\/p><p><span style=\"color: #000000;\">The commissioning of the 3 first stations 2 years earlier than the completion of the entire Metro Line 3 Extension has great socioeconomic and other benefits, such as a positive impact on the fight against climate change: reduced car traffic by 11,000 vehicles and reduced CO<sub>2<\/sub> emissions by 60 tons on a daily basis.<\/span><\/p><p><span style=\"color: #000000;\">The entire Line 3 Extension was commissioned on October 10<sup>th<\/sup>, 2022.<\/span><\/p><p><span style=\"color: #000000;\">Upon the completion of the project and the commissioning of MANIATIKA, PIRAEUS and DIMOTIKO THEATRO Stations, the total ridership on the Metro network is expected to be increased by 132,000 passengers\/day, thus, reducing the circulation of private vehicles by 23,000 cars per day and carbon dioxide emissions by 120 tons per day.<\/span><\/p><p><span style=\"color: #000000;\">It is pointed out that both the citizens and the visitors of the country will be able to travel by Metro and reach Athens International Airport \u201cEleftherios Venizelos\u201d directly from Piraeus Port in just 55 minutes.<\/span><\/p><p><span style=\"color: #000000;\">It is important to emphasize that upon the completion of the project, a major Transportation Hub of particular importance is created in PIRAEUS Station, which functionally integrates two Metro lines (Lines 1 and 3), the Port of Piraeus, the Suburban Railway and the Tramway network, facilitating, thus, intermodal transfers.<\/span><\/p><p><span style=\"color: #000000;\">In addition, the resulting connection between the Port of Piraeus and Athens International Airport \u201cEleftherios Venizelos\u201d via Metro Line 3 fosters growth in the greater area of Athens and Piraeus, with substantial benefits to the National Economy in general.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>LINE 3 (EGALEO \u2013 DOUKISSIS PLAKENTIAS \u2013 AIRPORT) The construction of Line 3 commenced in November 1992. The 7 first stations of the Line in SYNTAGMA \u2013 ETHNIKI AMYNA section were handed over to the public in January 2000, while the last section of the Base Project, SYNTAGMA \u2013 MONASTIRAKI section comprising of 1.4km of tunnel and one station, was commissioned in April 2003. ETHNIKI AMYNA \u2013 DOUKISSIS PLAKENTIAS \u2013 AIRPORT EXTENSION ETHNIKI AMYNA\u2013DOUKISSIS PLAKENTIAS\u2013AIRPORT extension is a section of the Athens Metro Line 3 covering an underground route of 5,9 km long up to DOUKISSIS PLAKENTIAS Station. At this point, the Metro trains emerge at the surface level and cover a distance of 20.7 km- using the Suburban Railway network- in order to reach ELEFTHERIOS VENIZELOS International Airport. \u00a0 Line 3 extension from ETHNIKI AMYNA to DOUKISSIS PLAKENTIAS includes 5 stations: HOLARGOS, NOMISMATOKOPIO, AGHIA PARASKEVI, HALANDRI and DOUKISSIS PLAKENTIAS. NOMISMATOKOPIO Station was commissioned early September 2009, HOLARGOS Station mid July 2010, while AGHIA PARASKEVI Station at the end of December 2010. At the same time, a new Depot (covering a area of 60, 000 sq.m.) was constructed to serve the needs of Line 3 in the area of Doukissis Plakentias, which is connected to DOUKISSIS PLAKENTIAS Station via a tunnel, 200m long. With regard to this extension, it is worth mentioning that: HALANDRI Station has been constructed in such a way so as to enable the future lowering of Plakentias Avenue (Pentelis Avenue). DOUKISSIS PLAKENTIAS Station is located below the multi-level junction of Attiki Odos. Compatibility between the Suburban Railway and the Metro line. The underground tunnel, which continues past DOUKISSIS PLAKENTIAS Station, emerges at the median of Attiki Odos. At this location, a provision was made to make a connection with the Suburban Railway line, which requires special systems layouts for the smooth changeover of the metro trains to the suburban railway network. ELEFTHERIOS VENIZELOS Airport Station serves the suburban railway and the Metro trains from different platforms. Moreover, there is a direct connection with the main Airport building. The distance between Monastiraki Station and the Airport is covered today in just 37 minutes. ETHNIKI AMYNA \u2013 DOUKISSIS PLAKENTIAS \u2013 ELEFTHERIOS VENIZELOS AIRPORT extension serves 55, 000 passengers on a daily basis MONASTIRAKI \u2013 EGALEO EXTENSION Line 3 Extension from Monastiraki to Egaleo is considered to be the most important transportation project in the western suburbs of the city. Regions not properly served by public transportation modes and less developed, exhibiting heavy traffic and quite extensive environmental pollution (Iera Odos and Thivon) are now enhanced thanks to the Metro operation. The Line extension is 4.2 km long and includes 3 stations (KERAMIKOS, ELEONAS &amp; EGALEO) and seven ventilation shafts. The Project was commissioned on May 26th 2007 and the western suburbs of Athens are now directly connected with the International Airport \u201cELEFTHERIOS VENIZELOS\u201d. All three new stations are characterized by high aesthetics, while their areas are of particular architectural layout. The stations are decorated with stations-specific works of art. In particular, KERAMIKOS Station is decorated with the work of Yiannis Bouteas entitled \u201cDiastromatossis\u2013Energiakes ikones-XVI\u201d, ELEONAS Station with the work of George Lazongas entitled \u201cDiadromes\u201d and EGALEO Station with the works of the late artistOpy Zouni entitled \u201cKiones \u2013 Skies\u201d and \u201cTesseris Pyles ston xoro\u201d. In the aforementioned stations, specially designed areas have been also formed where the most significant archaeological finds from the excavations are to be displayed. The benefits from the operation of the extension to Egaleo are numerous: Easy, rapid and reliable access to the city center. It is worth mentioning that the distance from Egaleo to Syntagma, currently covered by car in at least 40 minutes during rush hours, will be now covered in only 7 minutes by Metro! Connection of the Western Suburbs with Athens International Airport ELEFTHERIOS VENIZELOS. Mitigation of traffic problems and environmental pollution. Display of our cultural legacy in areas inside and outside the new Metro Stations. Re-development of the squares occupied for the project construction needs. New commercial activities are already developed in the surrounding area of the Metro stations, while the fact that the new stations are of high aesthetics will contribute to the upgrading of the image of the wider area. Moreover, ELLINIKO METRO S.A. proceeded with the new configuration of Egaleo Square underneath of which the new Metro Station is located. An underground parking facility of a capacity of 400 places for private vehicles shall be constructed adjacent to this Square for Metro transferring purposes. A similar parking facility shall also be constructed in ELEONAS Station. Finally,an underground modern 5-storey parking facility with a capacity of 270 private vehicles has been constructed in Keramikos and is expected to be delivered to the public soon. EGALEO &#8211; AGHIA MARINA EXTENSION In December 2013, ELLINIKO METRO S.A. commissioned a new 1.4km long extension of Line 3 from EGALEO Station to AGHIA MARINA Station (Municipality of Aghia Varvara). AGHIA MARINA Station serves more than 30,000 passengers\/day and it is estimated that the total daily ridership in Aghia Marina-Monastiraki Line 3 section exceeds 100,000 persons. Travel time between SYNTAGMA \u2013 AGHIA MARINA Stations is 8 min; this extension ensures transportation services to\/from the wider area of Egaleo, Haidari and Aghia Varvara Municipalities and, in particular, to\/from the Hospital for Infectious Diseases, Dromokaitio Hospital, Attikon Hospital, facilitating at the same time all commercial activities developed in the area. \u00a0 Through this Metro extension to one more area of the Western Suburbs of Attica region, ELLINIKO METRO S.A. provides the optimum possible transportation services to the involved Municipalities, offers rapid and safe transportation, and actually upgrades these areas. Moreover, Eleonas Depot, extending over a total area of 86,000m2, was also constructed in the framework of this contract, a project indispensable for Line 3; this Depot is already operating and serving the Metro network. It is also noted that in the area of the underground Eleonas Depot, ELLINIKO METRO S.A. has undertaken the construction of the Central Intercity Bus Terminal. Finally, in the framework of this contract, a Transfer Station\/Parking Facility with capacity of 382 places was constructed next to AGHIA MARINA Station and delivered to the public in April 2014. This Transfer Station\/Parking Facility serves the park-and-ride needs of citizens of Aghia Varvara, Egaleo and Haidari Municipalities and of the wider Western Attica region (Elefsina, Mandra etc.). This is a six-storey parking facility: one of these storeys is underground and operates in accordance with the highest safety standards for maximum passenger comfort. \u00a0 Aghia Marina \u2013 Dimotiko Theatro Extension Metro Line 3 Extension \u201cAghia Marina \u2013 Dimotiko Theatro\u201d includes a 7.6 km long tunnel, 6 new modern stations (AGHIA VARVARA, KORYDALLOS, NIKEA, MANIATIKA, PIRAEUS and DIMOTIKO THEATRO) and 7 ventilation intershafts. This is a 730,000,000.00 EURO investment project in areas of the Municipality of Piraeus and in other municipalities of Piraeus greater area (Nikea, Korydallos, Aghia Varvara), which were faced in the past with severe traffic congestion and were poorly served by public transport. As of July 6th \u00a02020, the first 3 stations of the Metro Extension to Piraeus, namely AGHIA VARVARA, KORYDALLOS and NIKEA, have been delivered to the public. The commissioned stations were designed by ELLINIKO METRO S.A. with priority given to bioclimatic features and to the safe circulation of the passengers in the Metro network. Since the commissioning of the three first stations of Piraeus extension, it is estimated that the number of passengers using the Metro network was increased by 63,000 on a daily basis, while the residents of Aghia Varvara, Korydallos and Nikea municipalities now benefit from a modern Metro line. The commissioning of the 3 first stations 2 years earlier than the completion of the entire Metro Line 3 Extension has great socioeconomic and other benefits, such as a positive impact on the fight against climate change: reduced car traffic by 11,000 vehicles and reduced CO2 emissions by 60 tons on a daily basis. The entire Line 3 Extension was commissioned on October 10th, 2022. Upon the completion of the project and the commissioning of MANIATIKA, PIRAEUS and DIMOTIKO THEATRO Stations, the total ridership on the Metro network is expected to be increased by 132,000 passengers\/day, thus, reducing the circulation of private vehicles by 23,000 cars per day and carbon dioxide emissions by 120 tons per day. It is pointed out that both the citizens and the visitors of the country will be able to travel by Metro and reach Athens International Airport \u201cEleftherios Venizelos\u201d directly from Piraeus Port in just 55 minutes. It is important to emphasize that upon the completion of the project, a major Transportation Hub of particular importance is created in PIRAEUS Station, which functionally integrates two Metro lines (Lines 1 and 3), the Port of Piraeus, the Suburban Railway and the Tramway network, facilitating, thus, intermodal transfers. In addition, the resulting connection between the Port of Piraeus and Athens International Airport \u201cEleftherios Venizelos\u201d via Metro Line 3 fosters growth in the greater area of Athens and Piraeus, with substantial benefits to the National Economy in general.<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":4176,"menu_order":190,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4182","page","type-page","status-publish","hentry"],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":" <a href=\"https:\/\/www.emetro.gr\/?lang=en\" rel=\"tag\">English<\/a>","rttpg_excerpt":"LINE 3 (EGALEO \u2013 DOUKISSIS PLAKENTIAS \u2013 AIRPORT) The construction of Line 3 commenced in November 1992. The 7 first stations of the Line in SYNTAGMA \u2013 ETHNIKI AMYNA section were handed over to the public in January 2000, while the last section of the Base Project, SYNTAGMA \u2013 MONASTIRAKI section comprising of 1.4km of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/4182","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4182"}],"version-history":[{"count":12,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/4182\/revisions"}],"predecessor-version":[{"id":32366,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/4182\/revisions\/32366"}],"up":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/4176"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}