{"id":23109,"date":"2022-05-06T13:29:51","date_gmt":"2022-05-06T10:29:51","guid":{"rendered":"https:\/\/www.emetro.gr\/?page_id=23109"},"modified":"2024-06-03T13:21:54","modified_gmt":"2024-06-03T10:21:54","slug":"thessaloniki-metro-extension-to-kalamaria-annual-environmental-report-2021","status":"publish","type":"page","link":"https:\/\/www.emetro.gr\/?page_id=23109&lang=en","title":{"rendered":"THESSALONIKI METRO EXTENSION TO KALAMARIA ANNUAL ENVIRONMENTAL REPORT \u2013 2021"},"content":{"rendered":"<p>All control and measurement related information recorded as follows concern the units of the Program covering the Environmental Requirements for year 2021:<\/p>\n<p><strong>Noise, Particulate Matters and Vibration related Measurements <\/strong><\/p>\n<p>In the framework of control of the noise, particulate matters and vibrations levels in the worksite areas of the Project, sixty (60) measurements were carried out in 20201 in total for each one of the aforementioned three categories.<\/p>\n<p>The overall presentation results from the monthly parameter measurement controls in five (5) worksites of the Project. Their detailed results have been submitted to ELLINIKO METRO S.A. through the monthly environmental reports.<\/p>\n<p>According to the results that were presented, the measurement values of the aforesaid categories have not been exceeded and, thus, no further management is required.<\/p>\n<p><strong>\u00a0<\/strong><strong>Pumped Water<\/strong> <strong>Control<\/strong><strong> \u2013 <\/strong><strong>Chemical<\/strong> <strong>Analyses<\/strong><\/p>\n<p><strong>\u00a0<\/strong>As regards the control of the pumped water in the Project worksites, twenty five (25) samplings and chemical analyses were carried out in year 2021.<\/p>\n<p>Their results, as presented in the monthly reports submitted to ELLINIKO METRO S.A., show that the reference parameter values have not been exceeded.<\/p>\n<p><strong>\u00a0<\/strong><strong>Waste<\/strong> <strong>Management<\/strong><\/p>\n<p>All hazardous and non hazardous waste of the Project is managed based on the applicable legislation and is recorded in the Electronic Registries for Waste\/Ministry of Environment and Energy through the annual declarations of waste. For each category of waste, licensed agencies are utilized for waste collection-transfer and management, while, at the same time, all required documentation is issued.<\/p>\n<p>The overall presentation of the quantities per waste category for year 2021 has been described in the monthly and semester monitoring reports that have been submitted by the Contractor and are accompanied by a detailed recording of data concerning Dates\/Dispatch Notes\/Worksites.<\/p>\n<p>All backup documentation is kept in the Project record and is available to the responsible Authorities and Project Agencies during their inspections.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All control and measurement related information recorded as follows concern the units of the Program covering the Environmental Requirements for year 2021: Noise, Particulate Matters and Vibration related Measurements In the framework of control of the noise, particulate matters and vibrations levels in the worksite areas of the Project, sixty (60) measurements were carried out in 20201 in total for each one of the aforementioned three categories. The overall presentation results from the monthly parameter measurement controls in five (5) worksites of the Project. Their detailed results have been submitted to ELLINIKO METRO S.A. through the monthly environmental reports. According to the results that were presented, the measurement values of the aforesaid categories have not been exceeded and, thus, no further management is required. \u00a0Pumped Water Control \u2013 Chemical Analyses \u00a0As regards the control of the pumped water in the Project worksites, twenty five (25) samplings and chemical analyses were carried out in year 2021. Their results, as presented in the monthly reports submitted to ELLINIKO METRO S.A., show that the reference parameter values have not been exceeded. \u00a0Waste Management All hazardous and non hazardous waste of the Project is managed based on the applicable legislation and is recorded in the Electronic Registries for Waste\/Ministry of Environment and Energy through the annual declarations of waste. For each category of waste, licensed agencies are utilized for waste collection-transfer and management, while, at the same time, all required documentation is issued. The overall presentation of the quantities per waste category for year 2021 has been described in the monthly and semester monitoring reports that have been submitted by the Contractor and are accompanied by a detailed recording of data concerning Dates\/Dispatch Notes\/Worksites. All backup documentation is kept in the Project record and is available to the responsible Authorities and Project Agencies during their inspections.<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":23047,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-23109","page","type-page","status-publish","hentry"],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":" <a href=\"https:\/\/www.emetro.gr\/?lang=en\" rel=\"tag\">English<\/a>","rttpg_excerpt":"All control and measurement related information recorded as follows concern the units of the Program covering the Environmental Requirements for year 2021: Noise, Particulate Matters and Vibration related Measurements In the framework of control of the noise, particulate matters and vibrations levels in the worksite areas of the Project, sixty (60) measurements were carried out&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/23109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23109"}],"version-history":[{"count":2,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/23109\/revisions"}],"predecessor-version":[{"id":26357,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/23109\/revisions\/26357"}],"up":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/23047"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}