{"id":21894,"date":"2021-11-26T14:23:37","date_gmt":"2021-11-26T11:23:37","guid":{"rendered":"https:\/\/www.emetro.gr\/?page_id=21894"},"modified":"2025-06-12T11:32:40","modified_gmt":"2025-06-12T08:32:40","slug":"thessaloniki-metro-development-study-mamth","status":"publish","type":"page","link":"https:\/\/www.emetro.gr\/?page_id=21894&lang=en","title":{"rendered":"Thessaloniki Metro Development Study (MAMTH)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"21894\" class=\"elementor elementor-21894\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3d1d7da6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3d1d7da6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-633a127d\" data-id=\"633a127d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5da6a366 elementor-widget elementor-widget-text-editor\" data-id=\"5da6a366\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong><u>Feasibility of the Project<\/u><\/strong><\/p><p>The design of the Thessaloniki Metro (Base Project, Extension to Kalamaria) was based on the General Transportation and Traffic Study for the city of Thessaloniki, which had been assigned by the Thessaloniki Regulatory Plan and Environmental Protection Organization (ORTHE) and was completed in 2000. Since then, no such study of this scale and extent has ever been prepared for the city of Thessaloniki. In view of fulfilling the needs of the Thessaloniki Metro Extension to Kalamaria, and having proceeded to the updating of the travel demand related data, ELLINIKO METRO S.A., in cooperation with Thessaloniki Integrated Transport Authority (SASTH), compiled the necessary studies (Feasibility Study, 2011), 2016 being the target year. \u00a0\u00a0<\/p><p>In view of investigating the needs for new Metro projects further to the implementation of the Metro Base Line and Kalamaria Extension and in an effort to prepare a Plan for the Development of a Metro Network in the city of Thessaloniki, in the framework of an updated Transportation Plan for this city \u2013 year 2040 being the 20-year planning horizon \u2013 the requirement has emerged for the preparation of a new General Transport Study, the Thessaloniki Metro Development Study (MAMTH), which specified the needs related to travel demands and to the development of respective infrastructure projects in the city of Thessaloniki.<\/p><p>The relevant survey has been conducted in conformance with the EU Regulation 2016\/679 (General Data Protection Regulation \u2013 GDPR) and the government\u2019s measures to avoid spread of corona virus covid-19.<\/p><p><strong><u>Study area\u00a0\u2013\u00a0benefited population<\/u><\/strong><\/p><p>The Study Area includes the Urban Complex of Thessaloniki and the surrounding Suburban Zone, with a total population of 991,847 inhabitants (Hellenic Statistical Authority \u2013 ELSTAT, 2011), corresponding to approximately 89% of Thessaloniki Prefecture (1,110,551 inhabitants).\u00a0<\/p><p>The Study Area includes the Municipalities of Thessaloniki, Kalamaria, Pylea-Hortiati, Thermi, Thermaikos, Neapoleos-Sykeon, Pavlou Mela, Ambelokipi-Menemeni, Eleftheriou-Kordelio, Oreokastro, Langadas and Delta.<\/p><p><strong><u>Description<\/u><\/strong>\u00a0<strong><u>of<\/u><\/strong>\u00a0<strong><u>the<\/u><\/strong>\u00a0<strong><u>physical<\/u><\/strong>\u00a0<strong><u>scope<\/u><\/strong><\/p><p>The Thessaloniki Metro Development Study is a General Transport Study aiming at configuring a Transport Plan in the framework of the medium\/long-term Transport Planning for the city of Thessaloniki (target-years: 2030 and 2040).<\/p><p>In brief, MAMTH scope of works includes the following, namely:<\/p><ol><li>Inventory of existing features governing the operation of the transport systems in the Study Area, as well as the characteristics or parameters specifying these systems\u2019 supply and demand.\u00a0 For this purpose, the following surveys shall be carried out, namely:<\/li><\/ol><ul><li>Household Survey<\/li><li>Stated Preference Survey<\/li><li>Inventories and Measurements in the Main Road Network and Roadside Survey<\/li><li>Measurements and Surveys in the Public Transport Modes (Urban Buses, Terminal Stations)<\/li><\/ul><ol><li>Analysis of existing features and creation of relevant Data Bases.<\/li><li>Development of alternative scenarios concerning the transport infrastructure networks in the framework of the medium\/long-term Development Planning of the Study Area and the transport systems. \u00a0<\/li><li>Development of the Transport Model for the city of Thessaloniki, in other words, of the mechanism for the simulation of the transport operation in the Study Area and those items defining the transport systems\u2019 supply and demand, in order to evaluate the alternative scenarios for the transport networks to select the optimum Metro Network Development Plan in the framework of a comprehensive Transport Plan. \u00a0<\/li><\/ol><p>Moreover, provision is made for the following sub-projects:<\/p><p>\u00a0\u2013 Sub-project 2 concerning the award of a Consulting Services Agreement to assist the Service in the activities pertaining to the supervision of MAMTH;<\/p><p>\u2013 Sub-project 3 concerning the Upgrading of VISUM Software, which is the necessary tool to meet the needs for supervision, monitoring and control of all Contractor\u2019s works related to (a) the development of the Transport Model, and (b) its utilization in the examination of alternative scenarios for the development of the Metro Network in Thessaloniki, as well as the inspection of all related Deliverables, and<\/p><p>\u00a0\u2013 Sub-project 4 concerning advertising related activities (creation of promotion material for MAMTH) in view of updating the target public as regards the conduct of the study in question in the entire Urban Complex and the suburban zone of Thessaloniki, ensuring the participation and cooperation of the public throughout the surveys and establishing trust, as regards the significance of the project, in view of improving the traffic conditions and the quality of life of those participating in the survey.<\/p><p><strong><u>Project Objective<\/u><\/strong><\/p><p>The preparation of the General Transport Study for the Thessaloniki Metro Development Study (MAMTH) for the Study Area<\/p><p><strong><u>Funding Items<\/u><\/strong><\/p><p>Act Integration Decision: \u03bf\u03b9\u03ba. \u0395\u03a5\u0394\/\u0395\u03a0 \u03a5\u039c\u0395\u03a0\u0395\u03a1\u0391\u0391 1823\/18-2-2021 Ministry of Development and Investments<\/p><p>Act Title: \u201cThessaloniki Metro Development Study (MAMTH)\u201d<\/p><p>Integrated IS number: 5070455<\/p><p>Operational Program: \u201cTransport Infrastructures, Environment and Sustainable Development 2014-2020\u201d<\/p><p>Eligible public expenditure: EURO 2,195,920.50<\/p><p>Cohesion Fund \u2013 co-funded by Greece and the European Union<\/p><p><strong><u>Data of the Thessaloniki Metro Development Study Contract (Sub-project 1)<\/u><\/strong><\/p><p>Expenditure budget without VAT: 2,012,270.00\u20ac<\/p><p>Contract conclusion date: 17-09-2020<\/p><p>Contractor: ADT-OMEGA Engineers Consultants ATE<\/p><p>Contract duration: 800 calendar days as of the Order to Proceed<\/p><p><strong><u>Data of the Awarding Authority<\/u><\/strong><\/p><p>Awarding Authority: ELLINIKO METRO S.A.<\/p><p>Managing Department: Thessaloniki Metro Development Directorate<\/p><p>Co-funded by the NSRF, Operational Program \u201cTransport Infrastructure, Environment and Sustainable Development\u201d, and Priority Axis 16 \u201cTechnical Assistance Programme\u201d of the Cohesion Fund.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-52b493c elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"52b493c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-b27068c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"b27068c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-0c024fe\" data-id=\"0c024fe\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-269b1d3 elementor-widget elementor-widget-video\" data-id=\"269b1d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;youtube_url&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=KP-X_rLATiI&quot;,&quot;video_type&quot;:&quot;youtube&quot;,&quot;controls&quot;:&quot;yes&quot;}\" data-widget_type=\"video.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-wrapper elementor-open-inline\">\n\t\t\t<div class=\"elementor-video\"><\/div>\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Feasibility of the Project The design of the Thessaloniki Metro (Base Project, Extension to Kalamaria) was based on the General Transportation and Traffic Study for the city of Thessaloniki, which had been assigned by the Thessaloniki Regulatory Plan and Environmental Protection Organization (ORTHE) and was completed in 2000. Since then, no such study of this scale and extent has ever been prepared for the city of Thessaloniki. In view of fulfilling the needs of the Thessaloniki Metro Extension to Kalamaria, and having proceeded to the updating of the travel demand related data, ELLINIKO METRO S.A., in cooperation with Thessaloniki Integrated Transport Authority (SASTH), compiled the necessary studies (Feasibility Study, 2011), 2016 being the target year. \u00a0\u00a0 In view of investigating the needs for new Metro projects further to the implementation of the Metro Base Line and Kalamaria Extension and in an effort to prepare a Plan for the Development of a Metro Network in the city of Thessaloniki, in the framework of an updated Transportation Plan for this city \u2013 year 2040 being the 20-year planning horizon \u2013 the requirement has emerged for the preparation of a new General Transport Study, the Thessaloniki Metro Development Study (MAMTH), which specified the needs related to travel demands and to the development of respective infrastructure projects in the city of Thessaloniki. The relevant survey has been conducted in conformance with the EU Regulation 2016\/679 (General Data Protection Regulation \u2013 GDPR) and the government\u2019s measures to avoid spread of corona virus covid-19. Study area\u00a0\u2013\u00a0benefited population The Study Area includes the Urban Complex of Thessaloniki and the surrounding Suburban Zone, with a total population of 991,847 inhabitants (Hellenic Statistical Authority \u2013 ELSTAT, 2011), corresponding to approximately 89% of Thessaloniki Prefecture (1,110,551 inhabitants).\u00a0 The Study Area includes the Municipalities of Thessaloniki, Kalamaria, Pylea-Hortiati, Thermi, Thermaikos, Neapoleos-Sykeon, Pavlou Mela, Ambelokipi-Menemeni, Eleftheriou-Kordelio, Oreokastro, Langadas and Delta. Description\u00a0of\u00a0the\u00a0physical\u00a0scope The Thessaloniki Metro Development Study is a General Transport Study aiming at configuring a Transport Plan in the framework of the medium\/long-term Transport Planning for the city of Thessaloniki (target-years: 2030 and 2040). In brief, MAMTH scope of works includes the following, namely: Inventory of existing features governing the operation of the transport systems in the Study Area, as well as the characteristics or parameters specifying these systems\u2019 supply and demand.\u00a0 For this purpose, the following surveys shall be carried out, namely: Household Survey Stated Preference Survey Inventories and Measurements in the Main Road Network and Roadside Survey Measurements and Surveys in the Public Transport Modes (Urban Buses, Terminal Stations) Analysis of existing features and creation of relevant Data Bases. Development of alternative scenarios concerning the transport infrastructure networks in the framework of the medium\/long-term Development Planning of the Study Area and the transport systems. \u00a0 Development of the Transport Model for the city of Thessaloniki, in other words, of the mechanism for the simulation of the transport operation in the Study Area and those items defining the transport systems\u2019 supply and demand, in order to evaluate the alternative scenarios for the transport networks to select the optimum Metro Network Development Plan in the framework of a comprehensive Transport Plan. \u00a0 Moreover, provision is made for the following sub-projects: \u00a0\u2013 Sub-project 2 concerning the award of a Consulting Services Agreement to assist the Service in the activities pertaining to the supervision of MAMTH; \u2013 Sub-project 3 concerning the Upgrading of VISUM Software, which is the necessary tool to meet the needs for supervision, monitoring and control of all Contractor\u2019s works related to (a) the development of the Transport Model, and (b) its utilization in the examination of alternative scenarios for the development of the Metro Network in Thessaloniki, as well as the inspection of all related Deliverables, and \u00a0\u2013 Sub-project 4 concerning advertising related activities (creation of promotion material for MAMTH) in view of updating the target public as regards the conduct of the study in question in the entire Urban Complex and the suburban zone of Thessaloniki, ensuring the participation and cooperation of the public throughout the surveys and establishing trust, as regards the significance of the project, in view of improving the traffic conditions and the quality of life of those participating in the survey. Project Objective The preparation of the General Transport Study for the Thessaloniki Metro Development Study (MAMTH) for the Study Area Funding Items Act Integration Decision: \u03bf\u03b9\u03ba. \u0395\u03a5\u0394\/\u0395\u03a0 \u03a5\u039c\u0395\u03a0\u0395\u03a1\u0391\u0391 1823\/18-2-2021 Ministry of Development and Investments Act Title: \u201cThessaloniki Metro Development Study (MAMTH)\u201d Integrated IS number: 5070455 Operational Program: \u201cTransport Infrastructures, Environment and Sustainable Development 2014-2020\u201d Eligible public expenditure: EURO 2,195,920.50 Cohesion Fund \u2013 co-funded by Greece and the European Union Data of the Thessaloniki Metro Development Study Contract (Sub-project 1) Expenditure budget without VAT: 2,012,270.00\u20ac Contract conclusion date: 17-09-2020 Contractor: ADT-OMEGA Engineers Consultants ATE Contract duration: 800 calendar days as of the Order to Proceed Data of the Awarding Authority Awarding Authority: ELLINIKO METRO S.A. Managing Department: Thessaloniki Metro Development Directorate Co-funded by the NSRF, Operational Program \u201cTransport Infrastructure, Environment and Sustainable Development\u201d, and Priority Axis 16 \u201cTechnical Assistance Programme\u201d of the Cohesion Fund.<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":21892,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-21894","page","type-page","status-publish","hentry"],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":" <a href=\"https:\/\/www.emetro.gr\/?lang=en\" rel=\"tag\">English<\/a>","rttpg_excerpt":"Feasibility of the Project The design of the Thessaloniki Metro (Base Project, Extension to Kalamaria) was based on the General Transportation and Traffic Study for the city of Thessaloniki, which had been assigned by the Thessaloniki Regulatory Plan and Environmental Protection Organization (ORTHE) and was completed in 2000. Since then, no such study of this&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/21894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21894"}],"version-history":[{"count":26,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/21894\/revisions"}],"predecessor-version":[{"id":33521,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/21894\/revisions\/33521"}],"up":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/pages\/21892"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}