January 2015

The works for the relocation of PUO networks (EPA network, PPC networks, EYDAP networks and municipal lighting networks) at the sidewalk of Gr. Lambraki Street opposite the tramway route are in progress; Technical works are in progress in the area where KARAISKAKI stop is foreseen to be located, at the…
Μάθε Περισσότερα

January 2015

NOMARHIA Station & Crossover: The works for the construction of pits for the diversion of the central sewage pipe, the works for the diversion of traffic from Mitropoliti Kydonion Grigoriou street into a new street within the area of the former Farmaki camp, as well as the works for the…
Μάθε Περισσότερα

ATHENS METRO – ATTIKO METRO participation in the research project “RESOLUTE”

In the framework of the European Research & Innovation Program “HORIZON 2020”, approval was granted to the funding of the Research Project RESOLUTE (RESilience management guidelines and Operationalization applied to Urban Transport Environment), in which ATTIKO METRO participates as a fellow. The Project pertains to the Resilience and improved Management…
Μάθε Περισσότερα

December 2014

AGHIA VARVARA Station: The works for the construction of columns up to the mechanical floor level are in progress; KORYDALLOS Station: Concreting works of the foundation slab and the perimeter walls of the Station up to the concourse level are in progress; NIKEA Station: The works for the construction of…
Μάθε Περισσότερα

December 2014

The works for the installation of poles for changing the layout of ILPAP network were completed at Kononos street while, apart from the excavation of investigation trenches at various locations of the Project, works for the relocation of PUO networks at Lambraki street (EPA network, PPC and road lighting networks…
Μάθε Περισσότερα

December 2014

NOMARCHIA Station & Crossover: The works concerning the diversion of the sewage pipe through micro-TBM underground boring have been completed. The works for the diversion of traffic from Mitropoliti Kydonion Grigoriou street into a new street within the area of the former Farmaki camp, as well as the PUO network…