Θεσσαλονίκη Ιανουάριος 2022

January 2022

New Railway Station: In progress are hole drilling works for the installation of the platform screen doors support sub-frames. With regard to the traction power supply equipment, the installation of the 20 KV Medium Voltage MVP and SMVP.switchboards in the Lighting and Auxiliary Power Supply Substation (LAS) have been completed,…
Μάθε Περισσότερα

JANUARY 2022

TZAVELA Shaft  The following works have been completed: Permanent lining of the shaft and of the connecting tunnel. Architectural finishes – painting works at the staircase (walls, floors). Construction of sound absorbing plaster. Installation of staircase balustrades. Reinstatement of Tzavela and Lakonias Streets, opening to the MANIATIKA STATION STATION’s OPEN…
Μάθε Περισσότερα
Θεσσαλονίκη Οκτώβριος 2021

October 2021

New Railway Station: Completed are the works for the pumping station cladding using ceramic tiles, as well as the works for the installation of the monorail. Moreover, the installation of the traction power equipment (technical room 3.9), except for the transformer, has been completed. In progress are vertical marble cladding…
Μάθε Περισσότερα
Καλαμαριά Οκτώβριος 2012

October 2021

NOMARCHIA Station: In progress are works for the installation of granite tiles on parapet walls and skirting at the central staircase. KALAMARIA Station: In progress are works for the reinstatement of the central island at Pontou street, the installation of glass panes at the east and west entrances, as well…
Μάθε Περισσότερα

DECEMBER 2021

The Project concerning the Tramway Extension to Piraeus has been completed since 2019, while its commissioning had been scheduled for January 2020. However, after the unfortunate incident of the fire in a building listed for preservation on Omiridou Skylitsi Street, the tramway commissioning was suspended for safety reasons, further to…
Μάθε Περισσότερα
Θεσσαλονίκη Νοέμβριος 2021

November 2021

New Railway Station: With regard to the traction power equipment, the installation of a rectifier transformer is at a completion stage. In progress are works for the installation of equipment bases at the Lighting and Auxiliary Power Supply Substation (LAS). Completed are works for the installation of the fire-fighting system…
Μάθε Περισσότερα
Καλαμαριά Νοέμβριος 2021

November 2021

• Kritis Shaft: Preliminary works for the industrial flooring and waterproofing of the station are in progress. • NOMARCHIA Station (Station and Crossover): Reinstatement works at the station street-level are in progress, as well as works for the installation of stainless steel balustrades in the areas where passengers will move.…
Μάθε Περισσότερα
Θεσσαλονίκη Δεκέμβριος 2021

December 2021

New Railway Station: In progress are vertical marble cladding works at the accesses. With regard to the traction power supply equipment, the installation of the rectifier transformer has been completed. Completed are also works for the installation of equipment bases of the Lighting and Auxiliary Power Supply Substation (LAS), except…
Μάθε Περισσότερα