TZAVELA SHAFT The following works have been completed: Architectural finishes – painting works at the staircase (walls, floors). Construction of sound absorbing plaster. Installation of staircase balustrades. Installation of the entrance hatch at street level. Reinstatement of Tzavela and Lakonias Streets, opening to the MANIATIKA STATION STATION’s OPEN CUT      …
Μάθε Περισσότερα

Speech given by Mr. Nikolaos Kouretas, CEO and Vice Chairman of the BoD of ATTIKO METRO S.A. at Delphi Economic Forum 2022 about the projects of ATTIKO METRO S.A. in Athens and Thessaloniki, the construction of the New Line 4 – Section A’ “Alsos Veikou-Goudi” of the Athens Metro and the perspective for future extensions.

Speech given by Mr. Nikolaos Kouretas, CEO and Vice Chairman of the BoD of ATTIKO METRO S.A. at Delphi Economic Forum 2022 about the projects of ATTIKO METRO S.A. in Athens and Thessaloniki, the construction of the New Line 4 – Section A’ “Alsos Veikou-Goudi” of the Athens Metro and…
Μάθε Περισσότερα
Καλαμαριά - Φεβρουάριος 2022

February 2022

• NOMARCHIA Station (Station and Crossover): In the station, in progress are preliminary works for the installation of Platform Screen Doors (PSD). In the area of the crossover, in progress are works for the installation of ceramic tiles and the installation of trays. • KALAMARIA Station: In progress are works…
Μάθε Περισσότερα
Θεσσαλονίκη - Φεβρουάριος 2022

February 2022

• New Railway Station: Completed are hole drilling works for the installation of the platform screen doors (PSD) support sub-frames and of the transformers at the Lighting and Auxiliary Power Supply Substation (LAS). In progress are works for the installation of cable trays in the tunnel towards DIMOKRATIAS Station. •…
Μάθε Περισσότερα

FEBRUARY 2022

TZAVELA Shaft The following works have been completed: Architectural finishes – painting works at the staircase (walls, floors). Construction of sound absorbing plaster. Installation of staircase balustrades. Installation of the entrance hatch at street level. Reinstatement of Tzavela and Lakonias Streets, opening to the MANIATIKA STATION STATION’s OPEN CUT      …
Μάθε Περισσότερα

Conclusion of Memorandum of Cooperation among the Ministry of Infrastructures and Transport, the Municipality of Athens, ATHENS ANAPLASIS S.A. and ATTIKO METRO S.A., in the framework of the construction of the Athens Metro New Line 4 – Section A’ “Alsos Veikou – Goudi”  

Conclusion of Memorandum of Cooperation among the Ministry of Infrastructures and Transport, the Municipality of Athens, ATHENS ANAPLASIS S.A. and ATTIKO METRO S.A., in the framework of the construction of the Athens Metro New Line 4 – Section A’ “Alsos Veikou – Goudi”   The Minister Kostas Karamanlis stated: Metro…
Μάθε Περισσότερα

Conclusion of the Contract for the provision of Technical Consulting Services for the Metro Projects in Attica Region and the Athens Metro New Line 4 – Section A’ “Alsos Veikou – Goudi”

Conclusion of the Contract for the provision of Technical Consulting Services for the Metro Projects in Attica Region and the Athens Metro New Line 4 – Section A’ “Alsos Veikou – Goudi” The Contract for the provision of technical consulting services with the contracting consortium Hill International – ΝΑΜΑ Consulting…
Μάθε Περισσότερα
Καλαμαριά Ιανουάριος 2022

January 2022

NOMARCHIA Station (Station and Crossover): In progress are works for the installation of industrial roller shutters, stainless steel balustrades and cabling installation works in the escalators. In the area of the crossover, in progress are works for the construction of sewage network, painting works and works for the installation of…