Year: 2022

MAY 2022

TZAVELA Shaft The following works have been completed: Architectural finishes – Painting works at the staircase (walls, floors). Construction of sound absorbing plaster. Installation of staircase balustrades and balustrades at the street-level staircase. Installation of the entrance hatch at street level. Reinstatement of Tzavela and Lakonias Streets, opening to the…
Μάθε Περισσότερα

Visit of the Minister of Infrastructures and Transport K. Karamanlis at Katehaki TBM Shaft worksite, of the Athens Metro New Line 4, Section A’ “Alsos Veikou – Goudi”.

The Minister of Infrastructures and Transport Kostas Karamanlis made the first visit – inspection in a worksite of the Athens Metro Line 4. Mr. Karamanlis, along with the Deputy Minister responsible for Infrastructures George Karayiannis, visited the Katehaki worksite, in which the boring the relevant shaft has already commenced; this…
Μάθε Περισσότερα

April 2022

• NOMARCHIA Station (Station & Crossover): In progress are works for the installation of a lift housing structure at street level. In the area of the Crossover in progress are works for the completion of the installation of cylinders of the automatic gas fire suppression system. • ARETSOU Station: In…
Μάθε Περισσότερα
Καλαμαριά Μάρτιος 2022

March 2022

• Kritis Shaft: In progress are works for the installation of tunnel ventilation equipment. • NOMARCHIA Station (Station & Crossover): In progress are works for the installation of Inergen cylinders in the Crossover. • ARETSOU Station: In progress are works for the installation of granite flooring in entrances (surface level)…
Μάθε Περισσότερα
Θεσσαλονίκη Μάρτιος 2022

March 2022

• New Railway Station: Completed are works for the installation of guides of the exterior roller shutters at the accesses. In progress are works for the installation of ventilation / air conditioning system equipment. • DIMOKRATIAS Station: Completed are works for the installation of guides of the exterior roller shutters…
Μάθε Περισσότερα
AM_Dimotiko Theatro_Progress_April 2022

ARPIL 2022

TZAVELA Shaft The following works have been completed: Architectural finishes – painting works at the staircase (walls, floors). Construction of sound absorbing plaster. Installation of staircase balustrades and balustrades at the street-level staircase. Installation of the entrance hatch at street level. Reinstatement of Tzavela and Lakonias Streets, opening to the…
Μάθε Περισσότερα