APRIL 2019

Α. Tramway The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed. The following works are in progress: The trial run of the Tramway system and the adjustment – checking of the systems and devices controlling the operation of the Tramway system (for…
Μάθε Περισσότερα

APRIL 2019

– TBM access shaft: The waterproofing of the ceiling slab +62.86 has been completed. – Komninou shaft: The works for the staircase balustrade have been completed, while architectural works (hatch construction) are in progress. AGHIA VARVARA Station: The works for the installation of granite slabs on the floor and walls…