ΕΛΛΗΝΙΚΟ ΜΕΤΡΟ Α.Ε. – ELLINIKO METRO S.A.

  • English
    • Ελληνικά
ELLINIKO METRO
visual_id_ESPA
Menu
  • Company
    • Elliniko Metro S.A.
    • Establishing Law of ΕM
    • Board of Directors
    • Financial Data
    • Attiko Metro S.A. Organization Chart
    • Social responsibility
      • Facilities for PSNs in Stations and Trains
      • Re-configuration of Areas
    • ELLINIKO METRO S.A. Certification
    • Vacancies
  • Athens Metro
    • Historic Data
      • Transit in Athens
      • History of Line 1
      • Milestones of Project in Operation
    • Project Progress
      • Project Progress – Piraeus
      • Project Progress of Line 4-Section A-Alsos Veikou-Goudi
        • Photos of Project Progress – Line 4 – Section A: Alsos Veikou – Goudi
        • Line 4 – Section A Digital newsletter
    • Extension of Line 3 to Piraeus
    • Line 4
      • General description of Line 4
      • Section A: Alsos Veikou – Goudi
        • Tendering
        • Track alignment
        • Stations
        • Tunnel
        • Environmental studies
          • Annual Environmental Report 2022
          • Annual Environmental Report 2023
          • Annual Environmental Report 2023
          • Annual Environmental Report 2024
        • Geological and Geotechnical Investigation
        • Preliminary works for Athens Metro Line 4
    • Projects in Operation
      • Base Project
      • Line 2
      • Line 3
    • Transfer Stations
      • KATEHAKI Transfer Station
      • SYNGROY-FIX Transfer Station
      • NOMISMATOKOPIO Transfer Station
      • ETHNIKI AMYNA Transfer Station
      • HALANDRI Transfer Station
      • AGHIA MARINA Transfer Station
      • DOYKISSIS PLAKENTIAS Transfer Station
      • Program for the development of Parking facilities for Private Vehicles
      • KERAMIKOS Car Parking Facility
    • Funding
  • Thessaloniki Metro
    • History
    • Project progress
      • Project progress – Thessaloniki
      • Project Progress – Extension to Kalamaria
    • Stations
      • Base project Stations
      • Extension to Kalamaria
    • Archaeological Excavations
    • Thessaloniki Metro Development Study (MAMTH)
    • Extensions
    • Improvements of the Project Design
    • Annual Environmental Report
      • THESSALONIKI METRO EXTENSION TO KALAMARIA ANNUAL ENVIRONMENTAL REPORT – 2022
      • THESSALONIKI METRO EXTENSION TO KALAMARIA ANNUAL ENVIRONMENTAL REPORT – 2021
      • THESSALONIKI METRO EXTENSION TO KALAMARIA ANNUAL ENVIRONMENTAL REPORT – 2020
    • Funding
  • Tramway
    • Construction of TRAMWAY extensions
  • Technical data
    • Geology
    • Construction Methods
      • Construction of Tunnel & Stations using the Cut & Cover Method
      • Construction of Tunnel & Stations using the Cover & Cut Method
      • Tunnel & Station Construction using the Underground Conventional Boring Method (NATM)
    • Boring Machines
      • Open Face Shield Tunnel Boring Machine (OFS)
      • Hard Rock Shield, Tunnel Boring Machine (TBM)
      • Earth Pressure Balance, Tunnel Boring Machine (EPB)
    • Rolling Stock
      • First Generation of Trains
      • Second Generation of Trains
      • Third Generation of Trains
    • E/M Systems
      • Facilities
      • Track work
      • Traction Power Supply System
      • Fare Collection System
      • Communication Systems
      • Signaling
  • Metro & Culture
    • Archaeological Work at the Athens Metro
      • Archaeological Excavations
      • Antiquities & Extensions
    • Archaeological Project in the Thessaloniki Metro
  • Current Tenders
  • Press & Communication
    • Press Releases
    • Photos & Videos
      • Metro Extension to Piraeus
      • Thessaloniki Metro Construction
      • Extension of the Tramway to Piraeus
      • Line 4 construction
    • Maps
      • Athens Metro Map
      • Thessaloniki Metro Map
      • TRAMWAY Map
    • Contact us
    • Useful Links
    • FAQ (Frequently Asked Questions)
7

  1. 2012»

  • Front Page Press Releases,  Press Releases

    ATTIKO METRO, in cooperation with the National Technical University (NTU) and specifically its Seismic Technology Laboratory (STL), conducted on a seismic test bench a laboratory test in order to calibrate the accelerometers installed in Metro stations. After this calibration, ATTIKO METRO shall continue to monitor, in cooperation with STL, the seismic activity in the area of Metro stations. It is worth noting that, during the strong earthquake in Athens in 1999, ATTIKO METRO -with the aid of these instruments- recorded and delivered to the Greek State valuable data regarding the seismic activity in various areas of the Attica Basin. This data were utilized on the one hand to study the earthquake impact on the structures and, on the other hand, to update the seismic code for buildings. The installation of similar and more advanced instruments has been specified for the Metro extension to Piraeus, as well as for Thessaloniki Metro, in the framework of monitoring the seismic activity in all stations of the network. The above actions demonstrate ATTIKO METRO’s sensitivity as regards seismic protection both of its stations and the general urban web in the wider area of Athens, Thessaloniki and Piraeus.

    / 31/05/2012
    read more
  • Front Page Press Releases,  Press Releases

    ATHENS METRO – Cooperation agreement for the construction of a Central Interurban Bus Terminal in Athens

    / 30/05/2012
    read more
  • Front Page Press Releases,  Press Releases

    THESSALONIKI METRO – Officials from the Italian Ministry of External Affairs visited Thessaloniki Metro

    / 30/05/2012
    read more
  • Press Releases

    THESSALONIKI METRO – IMPERIAL COLLEGE

    / 30/05/2012
    read more
  • Announcements - Current Tenders

    ANNOUNCEMENT OF THE CANCELLATION OF AN INVITATION TO TENDER

    / 30/05/2012
    read more
  • Front Page Press Releases,  Press Releases

    THESSALONIKI METRO – ATTIKO METRO response to recent articles of the Press

    / 25/05/2012
    read more
  • Thessaloniki Base Project progress

    April 2012

    / 25/05/2012
    read more
  • Front Page Press Releases,  Press Releases

    CO-OPERATION BETWEEN ATTIKO METRO S.A. AND ALEXANDER S. ONASSIS PUBLIC BENEFIT FOUNDATION FOR THE PROJECT “RECONFIGURATION OF THE ATHENS CITY CENTRE ALONG THE AXIS OF PANEPISTIMIOU STREET”

    / 25/05/2012
    read more
  • Announcements - Current Tenders

    CO-OPERATION BETWEEN ATTIKO METRO S.A. AND ALEXANDER S. ONASSIS PUBLIC BENEFIT FOUNDATION FOR THE PROJECT “RECONFIGURATION OF THE ATHENS CITY CENTRE ALONG THE AXIS OF PANEPISTIMIOU STREET”

    / 25/05/2012
    read more
  • Piraeus Project progress

    May 2012

    / 17/05/2012
    read more
 Older Posts
Newer Posts 

Contact – Athen’s Office

ELLINIKO METRO S.A. – SINGLE – MEMBER COMPANY

191-193 Mesogeion Avenue

115 25 Athens

Tel. 210-6792399
Fax. 210-6792126

Email: [email protected]

Contact – Thessaloniki Office

40-60 Posidonos &
20-24 Erithrou Stavrou

Postal Code: 55535
Pylea – Thessaloniki,

Tel .: 2310-504.714, 504.739, 504.764

Press Services

Press Releases

FAQ

Structural Recording Of Buildings For The Athens Metro New Line4

Useful links

Terms Of Use
Privacy Policy 
Cookies Policy
Accessibility Statement
Sitemap

ELLINIKO METRO
ypourgeio
ee logo footer gr
ΕΣΠΑ
With co-financing of Greece and the European Union.
ELLINIKO METRO S.A. © 2024 All rights reserved